My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - American Structurepoint Inc - Traffic Signal System Inventory
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment to PSA - American Structurepoint Inc - Traffic Signal System Inventory
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:23:32 PM
Creation date
10/23/2019 11:05:09 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: 34D27A77-C199-4C01-AF7B-F2687E08D1B2 <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated December 20, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: 12/20/2018 <br />b. Owner: Citv of South Bend <br />C. Engineer: American Structure oint <br />d. Project: 119-001 Traffic Signal Inventory <br />2. Description of Modifications. <br />a. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br />Exhibit A, Page 1, Part 1, Paragraph 1 is modified to read as follows: <br />Engineer shall conduct a field inventory of the study intersections (up to 150 205) <br />that includes the following items: <br />d. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />Exhibit C, Page 1, Article 2 C2.01 is modified as follows: <br />Task 1 — Field Review 9! , <br />3610 <br />Task 2 — Signal Timings -50 $50�,450 <br />Task 3 — Citywide Synchro Model ___.- W $14,80 <br />TOTAL Q n 1� ;6 <br />3. Agreement Summary (Reference only) <br />a. Original Agreement amount: $ 93,560 <br />b. Net change for prior amendments: $ 0 <br />C. This amendment amount: $ 34,300 <br />d. Adjusted Agreement amount: $127,860 <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />2018.02215 <br />
The URL can be used to link to this page
Your browser does not support the video tag.