My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10082019 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2019
>
10082019 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:18:56 PM
Creation date
10/22/2019 12:18:33 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OCTOBER 8, 2019 295 <br />INDIANA EARTH, INC. <br />10343 McKinley Hwy. <br />Osceola, IN 46561 <br />Quotation was submitted by Mark Osler <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $41,100.00 <br />RITSCHARD BROS., INC. <br />1204 W. Sample St. <br />South Bend, IN 46619 <br />Quotation was submitted by Rachelle Dolniak <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $43,796.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Miller and carried, the above quotations <br />were referred to Engineering and Community Investment for review and recommendation. <br />OPENING OF QUOTATIONS — NORTH PUMPING STATION FLOOD DAMAGE REPAIRS <br />— PROJECT NO. 118-302 (LIABILITY INSURANCE) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotation was opened and read: <br />LARSON-DANIELSON CONSTRUCTION CO., INC. <br />302 Tyler St. <br />LaPorte, IN 46350 <br />Quotation was submitted by Timothy Larson <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />QUOTATION: $138,031 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Miller and carried, the above quotation <br />was referred to Engineering for review and recommendation. <br />OPENING AND AWARD OF QUOTATIONS — NOTRE DAME AVE. AUTOMATED PUSH <br />SIGNAL (APS) — PROJECT NO. 119-090 (TRAFFIC SIGNAL MAINTENANCE) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotation was opened and read: <br />MICHIANA CONTRACTING, INC. <br />7843 Lilac Road, PO Box 929 <br />Plymouth, IN 46563 <br />Quotation was submitted by Scott Kirkpatrick <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $16,337.50 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Miller and carried, the above quotation <br />was referred to Engineering for review and recommendation. After reviewing the quotation, Mr. <br />Kyle Silveus, Engineering, recommended that the Board award the contract to the sole <br />responsive and responsible quoter, Michiana Contracting, Inc., in the amount of $16,337.50. <br />Therefore, Ms. Maradik made a motion that the recommendation be accepted and the quotation <br />be awarded as outlined above. Ms. Miller seconded the motion, which carried. <br />
The URL can be used to link to this page
Your browser does not support the video tag.