<br />TRUNK SEWER IMPROVEMENT RESOLUTION NO. 243
<br />RESOLVED BY THE BOARD OF PUBLIC WORKS OF THE CITY OF SOUTH BEND,COUNW
<br />OF ST. JOSEPH, STATE OF INDIMA; That it is desired and deemed necessary to construct
<br />a sewer IN INDIANA AVENUE FROM KEMBLE AVEWJE TO FRANKLIN STREET all in said City, whin
<br />which, from its size and character, is not only intended and adapted for use by pro-
<br />perty owners whose property abuts along the line of said sewer, but is also intended
<br />and adapted for receiving sewerage from collateral drains 'already constructed or which
<br />may be hereafter constructed, and the same is hereby ordered constructed in and along
<br />-the following line in said City,to-wit:-
<br />Beginning at the center of Kemble Avenue and.
<br />the north curb; line of Indiana Avenue. -thence on a curve to the left with a radius of
<br />30 feet to the east to the. east line of Kemb le Avenue with a single ring, 22n =inch
<br />by 33 inch brick sewer, thence east on the center line of Indiana Avenue to the center
<br />of Scott Street with a 24 inch vitrified pipe sewer, thence still east along the center
<br />of said Indiana Avenue to the west curb line -of Franklin Street with a 20 inch
<br />.vitrified pipe sewer. Together with tree necessary manholes, inlets and house con-
<br />nections to the curb line along the line of said improvement.
<br />And to be built in accordance with the profileg
<br />specifications, detail plans, maps and estimates now on file in the office of the
<br />Department of Public Works of said City, which includes an estimate of the proportion
<br />that the cost of an adequate loc 1 sewer, built along the above line, bears to the
<br />cost of the main sewer, to be built as follows:- The cost of an adequate local sewer,
<br />built along the line above described, is hereby estimated and fixed to be 50% o•f the
<br />cost of the main sewer to be built along said line as above set forth, which propor-
<br />tion, as herein estimated and fixed shall be taken and adopted in all computations
<br />requiring. a knowledge of the cost of such sewer if built along the line where the main
<br />sewer is to be built. The cost of the construction of said sewer shall be divided as
<br />follows:
<br />1. So much of such cost as shall be equivalent to the construction of an
<br />adequated local sewer not adapted to receive sewage from collateral drains or sewers,
<br />if built along the proposed line as hereinabove set forth shall be paid by the abut-
<br />ting property holders and the City of South Bend, if it be determined that said City
<br />is benefited by said sewer in the same manner and to the same extent as local sewers,
<br />are paid for by them, under the Statutes in such cases made and provided.
<br />2. The excess of cost over and above what would be equivalent to the cost
<br />of a local sewer, if built along said line, shall be assessed against each piece of pre
<br />perty in the district or area to be drained and against the City, if it be determined
<br />that the said City is benefitted by the said sewer, according to the manner and method
<br />prescribed by law, all of which said property beneficially affected lies within the
<br />following described territory in the City of South Bend, County of St.Joseph, and
<br />State of Indiana,to-wit:-
<br />Begin at the center of Kemble Avenue and the north line of Indiana
<br />Avenue, thence east along the north line of Indiana Avenue 130 feet, thence north
<br />150 feet, thence east 75 feet, thence north to the center of the Indiana & Lake
<br />Michigan Railway Co. right of way, thence east along the center of said right of way
<br />a point 136 feet west of west line of Franklin Street, thence south parallel with and
<br />136 feet west of the west line of Franklin Street to a point 150 feet north of the
<br />north line of Indiana Avenue, thence east 36 feet, thence south 150 feet to the north
<br />line of Indiana Avenue, thence east to the east line of Franklin Street, thence south
<br />to a point 150 feet south of the south of the south line of Indiana Avenue, thence
<br />east 149 feet, thence south parallel with and 149 feet east of Franklin Street to a
<br />point 130 feet north of the north line of Calvert Street, thence west parallel with
<br />and 130 feet north of the Forth line of Calvert Street to a point 150 feet east of the
<br />east line of Kemble Avenue, thence north parallel with and 150 feet east of the east
<br />line of Kemble Avenue to a point 150 feet south of the south line of Indiana Avenue,
<br />thence west 50 feet, thence north 150 feet to the south line of Indiana Avenue, thence
<br />west along the south line of Indiana Avenue 130 feet to the center of Kemble Aveme,
<br />thence north 60 feet to the place of beginning.
<br />SAID IMPROVEMENT SHALL BE KNOWN AS THE INDIANA AVENUE TRUNK SEWER FROM
<br />KEMBLE AVENUE TO FRANKLIN STREET,UNDER IMPROVEMENT RESOLUTION NO. 243. In -the City of
<br />South Bend, Indiana.