Laserfiche WebLink
Board met in regular' session at 10.-00 A. I. All members present. <br />Bids were received read and opened for Pipe Suers on the following Streets <br />re fe rrefgot he Engineer for tabulation. , and re- <br />v -'Marion Street under improvement resolution No. 15S <br />✓Harris Street, under improvement resolution No. <br />�Birdsell Street, under improvement resolution 16o59 <br />� Trunk Sewer on South Main Street, under improvement resolution No. 1 6.. Sam <br />f e rre d t o City Engineer,* <br />ngi nee r. 7 e way. re - <br />Bids were received, reed and opened for Grade, curb and walk on the fol <br />fand the same were referred to the City Engineer for tabulation. lowing Streets. <br />Kinyon Street, under improvement resolution No. 169. <br />Howard Street, under Improvement Resolution No. 153. <br />,/Howard Street, under improvement resolution No. 154. <br />Emerick Street,) unde-r improvement resolution No. 156. <br />Bids received and opened on water connections on Wakewa Ave., under Upruvemeat resolutio <br />No. 182. The sawre were referred to the City Engineer for tabulation. <br />✓Mond and contract for :Pipe Sewer on aarst Street from Franklin to <br />. 1 2 signed y p Lafayette Street, <br />under improvement resolution No. 7 fined b DePae a Coussens and approved by the <br />/partial estimate for Brick Pavement on Fell �r gtreet2 allowed to Harry N. Barnes, Contractor and pproved bar the Boardto .... Sample � <br />. - - - • �4045. , <br />President. <br />