jun& 25t h.
<br />Board met in regular session at 10:00 A?M. All members present.
<br />Bids• were opened and were referred to the City Engineer for Tabulation on the follovd ng
<br />St re et s
<br />Pipe sewer on Garst
<br />street, Under Improvement
<br />Resolution No.
<br />172.
<br />macadam Pavement
<br />on
<br />Wake,wa Avenue, ""
<br />no No.
<br />167.
<br />"Grade, curb and
<br />walk
<br />ofi No. Lafayette St, ""
<br />"" ""
<br />162.
<br />"W no
<br />""
<br />"" :North Shore Drive ""
<br />"" ""
<br />163.
<br />✓ nn n"
<br />nn
<br />"" Nakewa Avenue n"
<br />n», "n
<br />164.
<br />'Marquette Avenue ""
<br />"" ; no
<br />165.
<br />;.
<br />Tecumseh Avenue ""
<br />no "M
<br />166.
<br />The Engineer to
<br />report the tabulation of same
<br />to the Board
<br />Friday June
<br />,-�Exeavation Bond,",
<br />of
<br />John H. Meyers for One Thousand
<br />Dollars
<br />( 1000.00)
<br />Board.
<br />28t h. 1912.
<br />approved by the
<br />fond and contract signed by C. H. Defrees and the American Surety Company of New York,
<br />and approved by, the Board. For Grade, Curb and Walk on Wood arcs and Blaine A venues,
<br />Under. Improvement Resolution No. 143. in the City of South B nd, Indiana.
<br />t-'ilearing given on Grade, Curb and Walk on Oakland Street,under Improvement Resolution No.
<br />155. The same was deferred until Wednesday June 26th. '1912p at 10:00 A.M.
<br />Communication on same r1ceived and referred to City Attorney`
<br />TRUNK SEWER IMPROVEMENT RESOLUTION NO. 192.
<br />RESOLVED by the Board of Public Works of the City of South Bend,
<br />.County of St. Joseph, State of Indiana; That it is desired and deemed necessary to
<br />construct a sewer in and- along OLIVE.SPREET.. AND',MICHIGAN AVENUE all in said City, which,
<br />Prom it s si ze and character, is not only intended and adapted for use by p rope rt y ow era
<br />whose property abuts along the line of said sewer, but is also intended and adapted for
<br />receiving sewage _ from collateral drains already constructed or which may be hereafter con-
<br />structed, and the 'same is hereby ordered constructed in and along the following line in
<br />said City,to-wit: Beginning at the intersection of Longley. Avenue and Olive Street;
<br />.thence North along the center of Olive Street a di st ance of 300 feet with a 24 inch
<br />vitrified pipe sewer; thence still north along the center line of said Olive Street to
<br />the center of Michigan Avenue with a 20 inch vitrified pipe sewer; thence north westerly
<br />along the center line of said Michigan Avenue a distanee .of 1436 feet measured along the
<br />center line of Michigan Avenue with a 15 inch vitrified pipe sewer, together with the
<br />necessary manholes, inllts and house connections to the curb line along the line of said
<br />improvement.
<br />And to be built in accordance with the profiles, specifications, detail
<br />plans, maps and estimate now on file in the office of the Department of Public Works of
<br />said City, which includes an estimate of the proportion, that the cost of an adequate
<br />loC9,1 sewer, built along the above line,bears to the cost of the main sewer, to be
<br />bui it as follows: The cost of an adequate local sewer, built along the line above de s-
<br />cribed, is hereby estimated a nd fixed to be of the cost
<br />of the main sewer to be built along said line as above set forth, which proportion, as
<br />herein estimated and fixed, shall -be taken and adopted in all computations requiring a
<br />knowledge of the cost of such local sewer if built il-ong the line where the main sewer is
<br />to be built. The cost of the construction of said sewer shall be divided as follows:.
<br />1. So much of such cost ashall be equivalent to the construction of an.
<br />adequate local sewer not adapted to receive sewage from collateral drains or sewers, if
<br />built along the proposed line as hereinabove set forth, shall be paid by the abutting
<br />property holders and the City of South Bend, if it be determined that said City`id bene-
<br />fited by said sewer in the same manner and to the same extent as local sewers, are
<br />paid for by them, under the Statutes in such cases made and provided.
<br />2. The excess of cost over and -above what would be equivalent to the cost
<br />of a local sewer, if built along said line, shall be assessed against each piece of pro-
<br />perty in the district or area to be drained and against the City, if it be determined that
<br />the said. City if benefited by the said sewer, according to the manner and method pre-
<br />scribed by law, all of which said property benefit!ially affected lies within the follow-
<br />ing described territory in the City of South Bend, County of St. Josejih, and State of
<br />I di ana,to-wit : -
<br />Beginning on the North line of Longley Avenue at a point 150 feet .
<br />east of the east. line of Olive Street; thence north parallel with and 150 feet east
<br />of the east line of said Olive Street to the south line of Michigan Avenue; thence
<br />northwesterly along the southerly line of said Michigan Avenue; thence northwesterly
<br />along the southerly line of said Michigan Avenue to the east lire of Olive Street;
<br />thence north along the east line of said Olive Street to a point 150 feet north of the
<br />north line of Michigan Avenue; thence northwesterly parallel with and 150 feet north
<br />of the northerly line of said Michigan Avenue to a point 1342 feet due west of the center
<br />
|