My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplement Agreement No 3 - DLZ Indiana LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Supplement Agreement No 3 - DLZ Indiana LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:11:34 AM
Creation date
10/9/2019 12:07:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUPPLEMENTAL AGREEMENT NO. 3 <br />This Supplemental Agreement No. 3 is made and entered into thist—dayof o , 20f, <br />by and between the City of South Bend, Indiana, acting by and through the Board of Public Works, <br />hereinafter referred to as the "LPA", and DLZ Indiana, LLC, 2211 East Jefferson Blvd., South Bend, IN 46615, <br />hereinafter referred to as the "CONSULTANT". <br />WITNESSETH <br />WHEREAS, the LPA and CONSULTANT did, on February 10, 2015 enter into an agreement for the <br />preparation of construction documents for the construction of the Road Reconstruction on Bendix Drive, <br />Designation Number 1400634. <br />WHEREAS, during the course of design, certain additional services not included in the original <br />contract dated February 10, 2015, Supplemental Agreement Number 1 dated April 11, 2017, and <br />Supplemental Agreement Number 2 dated December 20, 2018 have become necessary; specifically: <br />Right-of-way staking in preparation for relocation of a high-pressure gas main, <br />Limited part-time utility relocation observation and coordination with the gas utility <br />company to provide the location of the relocated gas main, <br />Additional construction phase services. <br />NOW THEREFORE, the LPA and the CONSULTANT desire to amend the above referenced Design <br />Contract as follows: <br />Delete Section IV Compensation of the LPA-Consulting Contract and replace with the following: <br />SECTION IV COMPENSATION. The LPA shall pay the CONSULTANT for the Services performed <br />under this Contract as set forth in Appendix "D" which is herein attached to and made an <br />integral part of this Contract. The maximum amount payable under this Contract shall not <br />exceed $557,750.00. <br />Add Subsection II.T.7. to Appendix "A" as follows: <br />Stake the east right-of-way line of Bendix Drive within the limits of the high-pressure <br />gas main relocation construction from the intersection of Boland Drive to the <br />intersection of Nimtz Parkway, approximately 2,400 lineal feet. <br />III. Add Subsection II.U.7. to Appendix "A" as follows:. <br />The CONSULTANT shall provide part-time Construction Observation services for the <br />duration of the high-pressure gas main relocation construction, up to 10 hours per <br />week for 13 weeks. The gas main relocation construction is located along Bendix <br />Drive, from the intersection of Boland Drive to the intersection of Nimtz Parkway, <br />approximately 2400 lineal feet. Also, the CONSULTANT shall coordinate with the gas <br />utility company to obtain the X, Y, Z coordinates, if available, approximately every <br />100 feet along the newly relocated gas main for the LPA. <br />1of5 <br />Supplemental Agreement No. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.