My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - North Pumping Station Flood Damage Repairs Proj No 118-302 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - North Pumping Station Flood Damage Repairs Proj No 118-302 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:12:22 PM
Creation date
10/9/2019 11:33:53 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NAME: North Pumping Station - Flood Damage Repairs <br />PROJECT NO. 118-302 <br />QUOTES DUE October 8 2019 <br />(Must be completed for all quotes. Please type or print) <br />Date: October 8, 2019 Firm: Larson -Danielson Construction Co., Inc. <br />Address: 302 Tyler Street <br />City/State/Zip: LaPorte, IN 46350 Telephone Number: 219 362-2127 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />118-302 North Pumping Station - Flood Damage Repairs <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />Frost EngineeringEggineering and Consulting <br />and dated September 2019 for the sum of (enter the Total Quote as shown on the Proposal) <br />One Hundred Thirty -Eight Thousand, Thirty --One Dollars ($ 138,031 ) <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at than applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />By t <br />LARSON DANIELSON (Signature) <br />seat CONSTRUCTION CO,, INC. Timothy F. Larson„ President <br />(Printed Name of Person signing) <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />Laura L. O'Sullivan, Member <br />ACCEPTANCE <br />day of <br />Genevieve E. Miller, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />20 <br />Version 4/2/2019 Page -1 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.