My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Michigan St Pavement Replacement Proj No 118-075 - Walsh and Kelly
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Michigan St Pavement Replacement Proj No 118-075 - Walsh and Kelly
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:48:37 PM
Creation date
10/9/2019 10:42:12 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 1 18-075 Project Name: Michigan Street Pavement Replacement <br />Change Order #: 1 <br />DATE INITIATED: 9/18/19 ry ry <br />BPW DATE; <br />Brief Summary of Change Order; (Construction Change Alternative, Substitution, Differing Instructions, Out of Scope, Etc.), <br />-Stop Sign Flashing Beacons <br />-Replace Storm Structure #6071 <br />-Wayfinding Pole Foundations <br />-XyPex Waterproofing <br />-Contract Days for Additional Work. <br />Attachments: (List documents support change — required) <br />Contractor Pricing. <br />Amount of Blncrease / El Decrease: $ 25,195.60 <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 0 <br />8 Scope of Work <br />— -- <br />1.32 <br />8 Differing Site Conditions, Changed Conditions <br />Current Percent of Change: <br />❑ Conflicted Specifications <br />and Drawings <br />New Total Amount: $ <br />❑ Failed Materials <br />❑ Error <br />__................................................... <br />1.32 <br />❑ Omission <br />Total Percent of Change: <br />❑ Final Quantity Adjustment <br />Funding Secured From <br />(filled out by PM) <br />RECOMMENDED BY: <br />Josh Ehmer <br />- <br />9/19/19 <br />Project Inspector (Print Name) (Signadc <br />(Date) <br />REVIEWED BY: <br />_... d� \►� <br />9. 63•I91 <br />Construction Manager (Print Name) (Signature <br />Date <br />APPROVED BY: <br />3 ! <br />Engineering Project Manager (Print Name) , ig t <br />(Date) <br />APF'RQV D BY: <br />City Engineer (Print Name)(Signat± <br />(Dat <br />
The URL can be used to link to this page
Your browser does not support the video tag.