My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Liberty Tower Exterior Renovations Div B Project No 118-086R - Mulder Waterproofing and Sealants Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Liberty Tower Exterior Renovations Div B Project No 118-086R - Mulder Waterproofing and Sealants Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:47:32 PM
Creation date
10/9/2019 10:40:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.41 <br />y tl N� 'gym if 1 <br />#1 �y <br />WATERPROOFING <br />& SEALANTS, INC. <br />July 25, 2019 <br />Daniel R. Von Bergen I LEED AP Architect <br />Kil Architecture / Planning <br />1126 Lincolnway East, South Bend, IN 46601 <br />O: 574.288.2654 1 www.kilarchitecture.com <br />Re: Liberty Tower Louver Infill <br />Pursuant to your request and our on -site visit, Mulder Waterproofing is pleased to quote the Louver Infill <br />Mulder Waterproofing will provide all labor, materials, equipment, insurance and supervision to perform <br />this work. See below work Items: <br />All of the vents that are in the wall stay (including A and B). <br />The PVC pipe that is along the stair openings to be removed <br />All of the electric boxes to be removed comes out (4 boxes) <br />Infill opening at 7th floor (Mark D) <br />Vertical stair openings- 4 locations (2nd/3rd/4th/5th). <br />SCOPE OF WORK <br />Arrive on site <br />Prep by removing existing louver <br />Install mounting hardware for panels <br />Install Citadel Aluminum Foam Core Panels <br />Prime with Loxon XP <br />Coat with Elastomeric ConFlex XL <br />Caulk Perimeters <br />Clean up as required <br />..a "t. X.glj two <br />If you find cost acceptable, please fill in the information requested below and return one copy of this <br />proposal by fax, mail, or e-mail to the number/address listed at the bottom of this page. Payment terms are <br />Net 30 days. Finance charges will be assessed after 31 days. Finance charge at a rate of 2% per month will be <br />assessed on any balance past due. <br />ACCEPTED BY: DATE: AMOUNT: $ <br />Mulder Waterproofing wishes to thank you for the opportunity to quote this project and look forward to <br />working with you in the near future. If you have any questions please give me a call. <br />Sincerely, <br />Zach Mulder <br />Project Eslimator <br />Mulder Waterproofing <br />3420 Ravine Road <br />Kalamazoo. MI 49006 <br />269-381-8100 <br />File name: Liberty Tower Louvers.19 <br />3420 Ravine Road * Kalamazoo, MI 49006 * PH (269) 381-8100 FAX (269) 381-2943 <br />Email- zimullder imulldei atelrl roofin ,.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.