Laserfiche WebLink
BID/PROPOSAL �r° <br />CITY OF SOUTH BEND ' <br />Project Name: Century Center Parking Lot Entry Gateway Improvements <br />Project Number: 118-035A <br />For Bids Due: September 24, 2019 <br />Contractor Name: Tarson Danielson Construction Company, Inc. <br />Item <br />No. <br />Description <br />Quantit <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />1 �4 <br />$ <br />2 <br />Mobilization & Demobilization <br />1 <br />LS <br />a" <br />, <br />3 <br />Excavation, Common <br />222 <br />CYS <br />4 <br />Pavement, Remove <br />12 <br />SYS <br />Ll <br />5 <br />Curb, Concrete, Remove <br />150 <br />LFT <br />6 <br />Attendant Booth, Remove <br />1 <br />LS <br />;> <br />7 <br />Protective Bollard, Remove <br />5 <br />EA <br />8 <br />Sign, Relocate <br />1 <br />EA <br />&LA--)) <br />y.�p <br />9 <br />Temporary Inlet Protection <br />3 <br />EA <br />10 <br />Compacted Aggregate, No. 53 <br />110 <br />TON <br />3 `` <br />cl, 4;,)) S <br />11 <br />Curb, Concrete <br />420 <br />LFT, <br />12 <br />Concrete, Reinforced, 6 IN <br />468 <br />SYS <br />..--I k <br />13 <br />Single Swing Barrier Gate <br />4 <br />LSjca <br />14 <br />Misc. Electrical <br />1 <br />LS_=w,.� <br />15 <br />Electrical Handhole <br />5 <br />EA <br />-1 <br />16 <br />Wire, No. 4 <br />130 <br />LFT-. <br />a Lk (9 a <br />17 <br />Conduit, PVC, Schedule 80, 2 IN <br />108 <br />LFT <br />18 <br />Conduit, PVC, Schedule 80, 3 IN <br />26 <br />LFT <br />,. -),,rd <br />s <br />19 <br />Conduit, PVC, Schedule 80, 4 IN <br />42 <br />LFT <br />\ <br />F'T D <br />20 <br />Line, Thermoplastic, Crosswalk, <br />Solid, White 6 IN <br />102 <br />LFT <br />— <br />21 <br />Line, Thermoplastic, Solid, White, <br />46 <br />LFT <br />y <br />22 <br />Line, Epoxy, Solid, White, 6 IN <br />96 <br />LFT, <br />- <br />23 <br />Parking Lot attendant Booth <br />1 <br />EA <br />y .v <br />y - y r .) <br />24 <br />Protective Bollards <br />4 <br />EA <br />25 Hardwood Mulch, 3IN Depth 14 CYS <br />26 Irrigation Allowance 1 ALLOW $400 <br />0 <br />27 Irrigation Sleeve, PVC, 4 IN 45 LFT = <br />BASE QUOTE TOTAL <br />Version 4/2/2019 Contractor's Bid for Public Works - 7 <br />