My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - The Troyer Group - Services for East Bank East Race Repairs
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 1 to PSA - The Troyer Group - Services for East Bank East Race Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:19:20 PM
Creation date
10/9/2019 10:15:57 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of pages, referred to in and <br />part of the Agreement between Owner and Engineer for <br />Professional Services dated July 10, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 01 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement. July 10, 2018 <br />b. Owner: CBendmi m of South ............................�6_ <br />C. Engineer: The Troyer Group, Inc. <br />d. Project: 118-305 East Race and East Bank Repairs �m _.. .... <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />• Limited survey of existing East Bank Riverwalk and assessment of ADA and <br />PROWAG compliance. Limited topographic information will be gathered as <br />necessary to develop design documents <br />• Design, drafting, cost estimating, and specification and contract document <br />preparation to ensure that impacted sections of the East Bank Riverwalk meet ADA, <br />PROWAG, and City of South Bend standards. <br />• Design, drafting, cost estimating, and specification and contract document <br />preparation to incorporate three alternate sinkhole repair options in to contract <br />documents. Original contract included preparation of one repair option. <br />• Revision of contract documents from Bid format to Quote format. <br />• Revision of contract documents to separate the East Bank Sinkhole Repairs (City <br />Project 118-305A) from the East Race Boat Launch Slope Repairs (City Project 118- <br />305B) <br />• Additional fee associated with this work is $6,185.00. <br />b. For the Additional Services or the modifications to services set forth above, Owner shall <br />pay Engineer the following additional or modified compensation: $6,185.00 of additional <br />compensation to be added to Task # 1 of the original Agreement Between Owner and <br />Engineer for Professional Services executed on July 10, 2018. <br />Attached: Troyer Group Contract Ammendment Request dated August 26, 2019, <br />Page 1 <br />(Exhibit K—(Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.