My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Completion Affidavit - WWTP Headworks Influent Gates Improvements Project No 117-026 - HRP Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Project Completion Affidavit
>
Project Completion Affidavit - WWTP Headworks Influent Gates Improvements Project No 117-026 - HRP Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:41:37 PM
Creation date
9/25/2019 3:35:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAINTENANCE BOND <br />Bond No. MNT9270802 <br />KNOW ALL MEN BY THESE PRESENTS: <br />That HRP Construction Inc., PO Box 266, South Bend,, IN 46624-0266 <br />as Principal, hereinafter call Contractor, and Fidelity and Deposit Company of Maryland <br />dd <br />Chicago, U., as Surety, hereinafter call Surety, are held and firmly bound unto <br />of South Send, Indiana, Demutmcnt of Public Works, as Obligee, hereinafter called Owner, in the penal sum of <br />kl,573,11 _, for the payment whereof Contractor and Surety bind themselves, their heirs, executors, <br />administrators, successors, and assigns, jointly and severally, firmly by these presents. <br />WHEREAS, Contractor has by written agreement, dated_ _ December 12, 2017 <br />entered into a contract with Owner for Wastewater Treatment Plant Headworks Influent Bate lip rovernents <br />in accordance with the General Conditions, the Drawings and Specifications, which contract is by reference incorporated herein, <br />and made a part hereof, and is referred to as the Contract. <br />NOW, THEREFORE, the condition of this obligation is such that, if Contractor shall remedy any defects due to faulty materials or <br />workmanship, and pay for any damage to other work resulting therefrom, which shall appear within a period of three (3) year(s) <br />from the date of substantial completion of the work provided for in the Contract, then this obligation to be void; otherwise to <br />remain in full force and effect. <br />PROVIDED, HOWEVER, that Owner shall give Contractor and Surety notice of observed defects with reasonable promptness. <br />SIGNED and sealed this lst day of .o ust , 2019 <br />C t C c <br />Prin W a <br />By Matthew D. Cain, President (Seal) <br />(Seal) <br />
The URL can be used to link to this page
Your browser does not support the video tag.