Laserfiche WebLink
Zespollse J(a Reggestjor Undemrotind Storar—crank Renuival and Reinudiation <br />Ser"Ce". Former Steve's Marathon Servic'o Station Facflilv in Smith Bcnd. Indiana. Proposal #112019-07-15 1 Page 12 <br />Laboratory Analytical Costs <br />- Anticipated costs for laboratory analysis (Estimated 5 <br />groundwater samples to be collected plus laboratory <br />$760 <br />QA/QC samples) <br />- Note unit rate schedule for laboratory analytical costs <br />provided below <br />Waste Disposal <br />- Disposal of up to I drum of purged groundwater <br />$117 <br />generated during sampling activities <br />Quarterly Groundwater Monitoring Reporting <br />- Includes all reporting and administrative costs for $870 <br />preparation of final reports <br />Quarterly Groundwater Monitoring Subtotal <br />$2,732 <br />(Per Quarter) <br />Quarterly Groundwater Monitoring Subtotal <br />$21,856 <br />(Eight Quarters) <br />Monitoring Well Abandonment <br />..........- ----- -- <br />Task Cost <br />Monitoring Well Abandonment <br />- Lump sum cost for monitoring well abandonment for $1,500 <br />up to five (5) monitoring wells by licensed State of <br />Indiana water well driller <br />............. . ........... . . <br />Additional Fee Schedule Documentation <br />. .... . . ..... . ...... . <br />Soil Samples: <br />VOCs: $52.80 <br />PAHs: $62.70 <br />Lead: $8.80 <br />RCRA 8 Metals: $61.60 <br />Unit Rate Schedule for Laboratory Costs for Soil and PCBs: $88.00 <br />groundwater samples, if necessary, along with unit rate Groundwater Samples: <br />VOCs: $52.80 <br />schedule for 55-gallon drum waste disposal <br />PAHs: $62.70 <br />Lead: $8.80 <br />Lead Scavengers: $49.50 <br />RCRA 8 Metals: $61.60 <br />PCBs: $88.00 <br />Waste Disposal (Per 55-Gallon Drum): $117 <br />Estimated Project Total (All Phases) $138,748 <br />Heartland will work closely with IBP staff to ensure than all costs incurred as part of procured <br />consulting services are the most cost efficient and will work with IBP staff to minimize, where <br />possible, incurred environmental consulting costs related to site specific project work. A copy of <br />