My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Indiana Finance Authority Indiana Brownsfield Program
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - Indiana Finance Authority Indiana Brownsfield Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 2:13:40 PM
Creation date
9/25/2019 3:26:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Re"Donse to Reggest fin <br />. ................. . 2E .±,Lly[ro �,,ncnLal A,1,L!, -Cw, I Infic <br />�"o-,' Swum <br />Services. Fnringr Steve',; Marath�nl seaice stylioil FacifitV iV1 $WUth [kild, <br />N-fl 7- 15..! Page 10 <br />Anticipated costs for laboratory analysis (Estimated <br />26 soil samples and I groundwater sample to be <br />collected including laboratory QA/QC samples) <br />Note unit rate schedule for laboratory analytical costs <br />provided below <br />Soil Remedial Excavation <br />Costs for removal and disposal of up to 1,500 tons of <br />petroleum impacted soil <br />o Cost per ton to remove and dispose of <br />impacted soil provided at $34.54/ton. <br />$70,761 <br />Costs include import of granular, compactable <br />backfill and crushed stone to grade excavation pit <br />Cost per ton to import and place backfill provided at <br />$12.98/ton <br />Oxygen Releasing Agent Introduction <br />- Cost for up to 1,000 pounds EOS Remediation, LLC <br />EOx— introduction (via direct placement into open <br />pit) <br />$6,600 <br />- Note, should introduction via injections be <br />determined necessary, an additional $1,000 in cost <br />would be incurred <br />. .. . . ........ <br />Remediation Reporting <br />- Includes all reporting and administrative costs for <br />$2,595 <br />preparation of final reports <br />. ....... ... . ............ . ........ . . . . ...... <br />Underground Storage Tank Removal and <br />Remediation Subtotal <br />$100,883 <br />Subsurface Investigation <br />.. ... .. . ....... . <br />Task <br />Cost <br />Project Management, SAP and HASP Development <br />. . . ..... . ..... . ..... <br />Anticipated 4 hours of project management time at <br />$320 <br />$80/hr <br />Field Sampling Oversight <br />- Anticipated 10 hours of project geologist time at <br />$1,420 <br />$70/hr and 12 hours of field technician time at $60/hr <br />Equipment and Expendable Supplies <br />- Supplies for oversight and sampling, including <br />vehicle mileage <br />- Note due to proximity of Heartland's South Bend <br />$433 <br />office to project site, no mileage costs will be incurred <br />by the IFA as part of this project <br />...... . . .. <br />Drilling Subcontractor <br />$1,980 <br />Laboratory Analytical Costs <br />- Anticipated costs for laboratory analysis (Estimated <br />$3,113 <br />16 soil samples to be collected (8 soil borings with 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.