Laserfiche WebLink
Road Reconstruction of Olive Street <br />ahCE...��^� � FROM PRAIRIE AVENUE TO TUCKER DRIVE <br />�� <br />PROJECT MANAGER <br />BRET I <br />Project Manager <br />Bret's role on this project will be a hybrid of <br />onsite project management, cost -saving ideas, <br />project liaison, inspector, and communications <br />expert. His experience will allow him to identify <br />project issues before they become problems <br />and communicate timely recommendations <br />for cost-effective solutions. Bret will keep all <br />stakeholders informed of any project impacts <br />to ensure the project stays on schedule and is <br />completed to the City's vision. <br />RELEVANT EXPERIENCE <br />,t6TLf TTTTE".T REC0HSTAUCTi,C)N ISTPRiLtWtillll...... <br />IROAD TO WTt"1�i TITAiD), CARMEL, 04, Construction Project <br />Manager. This project consisted of nearly one mile of both roadway <br />reconstruction and new road construction over new terrain. The <br />project included construction of a new roundabout configuration <br />located on a new alignment near the existing 146th Street and Ditch <br />Road intersection. In addition to the roundabout, 146th Street was <br />reconstructed from Springmill Road to the new roundabout alignment. <br />A new pavement section was constructed to support the growing <br />traffic demands in the area. Bret assisted the County in defending <br />a very difficult situation created by pavement policy changes by <br />INDOT during the project. As part of Bret's hard work and detail in <br />documentation, he saved Hamilton County approximately $550,000 on <br />a change order claim <br />on the 146th and <br />Ditch Road project. <br />New multi -use paths <br />and concrete curbs <br />enhanced the area <br />for pedestrian use <br />and made the area <br />safer for all modes <br />of transportation. <br />The new terrain <br />roadway project <br />incorporated <br />approximately <br />500,000 cubic yards <br />of borrow material <br />obtained from two <br />on -site borrow pits. <br />I�1ANGELINE ROAD R10LJ N TA B,110LJT, <br />T'ARMELa, P4. Construction Project Manager. <br />The project consisted of the reconstruction of a <br />two-lane urban bridge over Little Cool Creek and <br />roundabout intersection of Rangeline Road and <br />Smokey Row Road. A cemetery, located within <br />close proximity of the project, created special <br />concerns for limited right-of-way access for <br />the construction of the project as well as major <br />existing utilities including a power substation <br />which required constant communication and <br />supervision. Additionally, as the first component <br />of future Rangeline Road updates, this "Fast <br />Track" project was completed in 12 months. <br />LETTER OF INTEREST TO PROVIDE PROFESSIONAL SERVICES ] UNITED CONSULTING PAGE 3 <br />