My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Road Reconstruction for Olive St in LaPorte District - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Proposals - Road Reconstruction for Olive St in LaPorte District - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:02:13 PM
Creation date
9/25/2019 3:15:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND OLIVE STREET ROAD RECONSTRUCTION <br />RESOURCES THAT STREAMLINE THE CONSTRUCTION PROCESS <br />17cr,1,Ar:r�:�rre,rrrr <br />(I�,Idee,t.vc� It:,�P;kfi �1iUY (2 ffi(viEx�7 e-,Jtu rtI rp,SIrf,iot �s���� b�xa.ur�:• <br />i' i!,mn.uIG dII'4IIIC L. Il.. din:PVP. III TIISII;: <br />Over the last 50 years, our staff <br />has provided construction in- <br />spection services on more than <br />175 INDOT/LPA projects, includ- <br />ing 55 in the LaPorte District <br />District. We have the technical <br />expertise and understanding <br />of the District's requirements <br />for materials, testing, EEO, and <br />final construction records. Our <br />inspectors have developed an <br />impressive set of technical capa- <br />bilities that allows them to docu- <br />ment all the daily work tasks per- <br />formed at the job site. Our staff <br />will use their technical expertise <br />on this project to: <br />• Track and document <br />construction material <br />quantities <br />• Test and sample materials <br />used <br />• Review daily maintenance <br />of traffic <br />• Address all concerns <br />for safety <br />• Maintain project accounting <br />and contractor payrolls <br />I IF li my , I E P4 C'Y <br />The construction process can <br />take a considerable amount of <br />time, which is why keeping an <br />eye on efficiency throughout the <br />entire project is so important. <br />To complete the construction <br />phase of this project in the most <br />efficient manner possible, our in- <br />spection team will: <br />Make timely and <br />knowledgeable decisions <br />Quickly evaluate <br />immediate/long-term <br />effects of our decisions <br />• Coordinate among <br />all parties through <br />transparency, <br />communication, and <br />fairness <br />Quickly complete required <br />project closeout activities <br />• Prepare/submit final <br />construction record within <br />45 days of contractor's <br />relieved -of -maintenance <br />date <br />Our team is equipped with the <br />most up-to-date testing equip- <br />ment, including 13 DCPs and six <br />LWDs, to provide the highest lev- <br />el of service. <br />Dynamic cone penetration <br />(DCP) testing is used to <br />measure the strength of in - <br />situ soil and the thickness <br />and location of subsurface <br />soil layers. DCP results <br />verify subgrade stability. <br />• Light weight deflectometer <br />(LWD) is a device that <br />measures the deflection <br />from a failing weight and <br />estimates the modulus. <br />LWD results tell inspectors <br />if material is suitable, <br />or if it is loose or poorly <br />compacted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.