Description:
<br />Precision Wall Systems Storm Sewer & Lot Upgrades. Owner: Precision Wall Systems. 825
<br />linear feet of storm sewer, 6 each 30" catch basins, remove 40 linear feet of retaining wall,
<br />remove 350 square yards of pavement, 1,000 cubic yards of retention pond, 350 square yards
<br />concrete drive 6", 160 linear feet concrete curb, 80 linear feet concrete retaining wall, 1890
<br />square yards grading for HAC and concrete areas, 1,540 square yards HAC pavement.
<br />$137,694.74 Year Completed: 2015
<br />Description:
<br />South Bend Edison Rd LS Access Road Construction. Owner: City of South Bend Board of
<br />Public Works. 174 square yards aggregate #53 6" base depth, 175 square yards geosynthetic
<br />fabric, 175 square yards B borrow 12" depth, adjust casting to grade. $15,659.25 Year
<br />Completed: 2015
<br />Description:
<br />South Bend Geyer Ditch LS Access Road Construction. Owner: City of South Bend Board of
<br />Public Works. Adjust casting to grade, concrete collar, 4,700 square yards compacted aggregate
<br />#53 at 6", 4,700 square yards Geosynthetic fabric. $72,410.00 Year Completed: 2015
<br />Description:
<br />Cassopolis Lift Station #1 Renovation. Owner: Village of Cassopolis. Lift station #1
<br />rehabilitation, restoration, masonry and concrete structure rem, chamfer removal, concrete
<br />surfacing 2", standby generator LS #1. $131,550.00 Year Completed: 2015
<br />Description:
<br />Goshen 321 South V Street Parking Lot. Owner: City of Goshen. Remove 270 square yards
<br />full depth concrete, remove 18 square yards concrete sidewalk, remove existing storm sewer
<br />structure, 115 ton 453 recycled concrete base, 40 linear feet 4" concrete sidewalk, 315 square
<br />yards 6" concrete, landscape restoration. $53,525.53 Year Completed: 2015
<br />Description:
<br />Warsaw Central Park Storm Sewer Cleaning project. Owner City of Warsaw. Install &
<br />remove inflatable plug, clean & video 36" diameter storm sewer, install manhole over existing
<br />storm sewer. $42,050.00 Year Completed: 2015
<br />Description:
<br />South Bend 2015 Curb/Sidewalk Construction Div. B. Owner: City of South Bend Board of
<br />Public Works, IN. Remove 3,000 linear feet curb & 395 square yard sidewalk, 3,000 linear feet
<br />new curb & 395 square yards new sidewalk, remove & replace I 1 trees, grade/sod 998 square
<br />yards. $257,718 Year Completed: 2015
<br />Description:
<br />Mishawaka Front St Roundabout Reconstruction. Owner: City of Mishawaka Board of
<br />Public Works, IN. 826 square yards QC/QA PCCP, 581 linear feet concrete curb, 14 square
<br />yards topsoil. $105,701.04 Year Completed: 2015
<br />
|