BID/PROPOSAL,,
<br />CITY OF SOUTH BEND
<br />Project Name: Century Center Parking Lot Entry Gateway Improvements
<br />. ...........� — ..
<br />Project Number: 118-035A
<br />_W.m.. .................................................. _................
<br />For Bids Due: September 24, 2019 w °
<br />Contractor Name: R. Yoder Construction, Inc.
<br />X01110MA
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Construction Engineering
<br />1
<br />LS
<br />7,475.00
<br />$ 7,475.00
<br />2
<br />Mobilization & Demobilization
<br />1
<br />LS
<br />6,450.00
<br />6,450.00
<br />3
<br />Excavation, Common
<br />222
<br />CYS
<br />_ w
<br />_ 72.50
<br />16,095.00
<br />4
<br />Pavement, Remove
<br />12
<br />SYS
<br />217.00
<br />2,604.00
<br />5
<br />Curb, Concrete, Remove
<br />150
<br />LFT
<br />18.10
<br />2,715.00
<br />6
<br />Attendant Booth, Remove
<br />1
<br />LS
<br />2,412.00
<br />2,412.00
<br />7
<br />Protective Bollard, Remove
<br />5
<br />EA
<br />150.70
<br />753.50
<br />8
<br />Sign, Relocate
<br />1
<br />EA
<br />2,718.85
<br />2,718.85
<br />9
<br />Temporary Inlet Protection
<br />3
<br />EA
<br />271.25
<br />813.75
<br />10
<br />Compacted Aggregate, No. 53
<br />110
<br />TON
<br />66.32
<br />7,295.20
<br />11
<br />Curb, Concrete
<br />420
<br />LFT
<br />23.54
<br />9,886.80
<br />12
<br />Concrete, Reinforced, 6 IN
<br />468
<br />SYS
<br />68.30
<br />31,964.40
<br />13
<br />Single Swing Barrier Gate
<br />4
<br />LS
<br />3,096.62
<br />12,386.48
<br />14
<br />Misc. Electrical
<br />1
<br />LS
<br />5,063.80
<br />5,063.80
<br />15
<br />Electrical Handhole
<br />5
<br />EA
<br />1,229.75
<br />6,148.75
<br />16
<br />Wire, No. 4
<br />130
<br />LFT
<br />11.03
<br />1,433.90
<br />17
<br />Conduit, PVC, Schedule 80, 2 IN
<br />108
<br />LFT
<br />16.13
<br />1,742.04
<br />18
<br />Conduit, PVC, Schedule 80, 3 IN
<br />26
<br />LFT
<br />34.32
<br />................................................................
<br />.. 892.32
<br />19
<br />Conduit, PVC, Schedule 80, 4 IN
<br />42
<br />LFT
<br />36.75
<br />1,543.50
<br />20
<br />Line, Thermoplastic, Crosswalk,
<br />102
<br />LFT
<br />10.80
<br />1,101.60
<br />........6
<br />Solid, White, 6 IN
<br />_
<br />_
<br />..... ........ ......... .......................m
<br />... ........... ............ .....__...........
<br />21
<br />Line, Thermoplastic, Solid, White ,
<br />46
<br />LFT
<br />10.80
<br />496.80
<br />IN
<br />22
<br />Line, Epoxy, Solid, White, 6 IN
<br />96
<br />LFT
<br />13.56
<br />1,301.76
<br />23
<br />Parking Lot attendant Booth
<br />_
<br />1
<br />EA
<br />13,186.50
<br />13,186.50
<br />24
<br />Protective Bollards
<br />4
<br />EA
<br />1,025.00
<br />4,100.00
<br />25
<br />Hardwood Mulch, 3 IN Depth
<br />14
<br />CYS
<br />114.50
<br />1,603.00
<br />26
<br />Irrigation Allowance
<br />1
<br />ALLOW
<br />$400
<br />400.00
<br />27
<br />Irrigation Sleeve, PVC, 4 IN
<br />45
<br />LFT
<br />21.00
<br />945.00
<br />BASE QUOTE TOTAL
<br />$ 143,528.95
<br />Version 4/2/2019 Contractor's Bid for Public Works - 7
<br />
|