Laserfiche WebLink
BID/PROPOSAL,, <br />CITY OF SOUTH BEND <br />Project Name: Century Center Parking Lot Entry Gateway Improvements <br />. ...........� — .. <br />Project Number: 118-035A <br />_W.m.. .................................................. _................ <br />For Bids Due: September 24, 2019 w ° <br />Contractor Name: R. Yoder Construction, Inc. <br />X01110MA <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />7,475.00 <br />$ 7,475.00 <br />2 <br />Mobilization & Demobilization <br />1 <br />LS <br />6,450.00 <br />6,450.00 <br />3 <br />Excavation, Common <br />222 <br />CYS <br />_ w <br />_ 72.50 <br />16,095.00 <br />4 <br />Pavement, Remove <br />12 <br />SYS <br />217.00 <br />2,604.00 <br />5 <br />Curb, Concrete, Remove <br />150 <br />LFT <br />18.10 <br />2,715.00 <br />6 <br />Attendant Booth, Remove <br />1 <br />LS <br />2,412.00 <br />2,412.00 <br />7 <br />Protective Bollard, Remove <br />5 <br />EA <br />150.70 <br />753.50 <br />8 <br />Sign, Relocate <br />1 <br />EA <br />2,718.85 <br />2,718.85 <br />9 <br />Temporary Inlet Protection <br />3 <br />EA <br />271.25 <br />813.75 <br />10 <br />Compacted Aggregate, No. 53 <br />110 <br />TON <br />66.32 <br />7,295.20 <br />11 <br />Curb, Concrete <br />420 <br />LFT <br />23.54 <br />9,886.80 <br />12 <br />Concrete, Reinforced, 6 IN <br />468 <br />SYS <br />68.30 <br />31,964.40 <br />13 <br />Single Swing Barrier Gate <br />4 <br />LS <br />3,096.62 <br />12,386.48 <br />14 <br />Misc. Electrical <br />1 <br />LS <br />5,063.80 <br />5,063.80 <br />15 <br />Electrical Handhole <br />5 <br />EA <br />1,229.75 <br />6,148.75 <br />16 <br />Wire, No. 4 <br />130 <br />LFT <br />11.03 <br />1,433.90 <br />17 <br />Conduit, PVC, Schedule 80, 2 IN <br />108 <br />LFT <br />16.13 <br />1,742.04 <br />18 <br />Conduit, PVC, Schedule 80, 3 IN <br />26 <br />LFT <br />34.32 <br />................................................................ <br />.. 892.32 <br />19 <br />Conduit, PVC, Schedule 80, 4 IN <br />42 <br />LFT <br />36.75 <br />1,543.50 <br />20 <br />Line, Thermoplastic, Crosswalk, <br />102 <br />LFT <br />10.80 <br />1,101.60 <br />........6 <br />Solid, White, 6 IN <br />_ <br />_ <br />..... ........ ......... .......................m <br />... ........... ............ .....__........... <br />21 <br />Line, Thermoplastic, Solid, White , <br />46 <br />LFT <br />10.80 <br />496.80 <br />IN <br />22 <br />Line, Epoxy, Solid, White, 6 IN <br />96 <br />LFT <br />13.56 <br />1,301.76 <br />23 <br />Parking Lot attendant Booth <br />_ <br />1 <br />EA <br />13,186.50 <br />13,186.50 <br />24 <br />Protective Bollards <br />4 <br />EA <br />1,025.00 <br />4,100.00 <br />25 <br />Hardwood Mulch, 3 IN Depth <br />14 <br />CYS <br />114.50 <br />1,603.00 <br />26 <br />Irrigation Allowance <br />1 <br />ALLOW <br />$400 <br />400.00 <br />27 <br />Irrigation Sleeve, PVC, 4 IN <br />45 <br />LFT <br />21.00 <br />945.00 <br />BASE QUOTE TOTAL <br />$ 143,528.95 <br />Version 4/2/2019 Contractor's Bid for Public Works - 7 <br />