My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Century Center Parking Lot Entry Gate Improvements Proj No 118-035A - Larson Danielson Construction - 3
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Century Center Parking Lot Entry Gate Improvements Proj No 118-035A - Larson Danielson Construction - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 8:50:30 AM
Creation date
9/25/2019 3:08:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLASS III 611117 Waa 6 <br />$26.90 '$27.30 $27.70 <br />Buck Hoist <br />Combination - Small Equipment Operator <br />Conveyor, portable <br />Grouting Machines <br />Hoist Elevators Mat'] and Personnel <br />Hydraulic Power Units Grouting and Pile -Driving <br />Lowboys <br />Stud Welder <br />Trenching Machines less than 12 inches in width <br />Welding Machines 8 through 15 <br />CLASS IV <br />611117 Willa <br />$26.10 $2630 <br />Bobcat (up to and including 3/4 cu. yd.) <br />Compressor over 210 cu. ft. and less than 600 cu. ft. <br />Generators - over 50kw <br />Heaters, Mechanical <br />Hoists, all elevators (perm. installation) <br />Hoist, automatic <br />Hoist, tugger single drum <br />Oilers <br />Pumps, Well Points and Electric -Submersibles <br />Small Rubber Tired End Loaders 1/4 cu. yd. and under <br />Tractors, farm type <br />Welding Machines (2 through 8) <br />CLASS <br />23.50 <br />Bobcats (Commercial and Residential) <br />+ These wage classifications become effective June 1, 2003 and apply only where Employers have determined to <br />assign the operation of such machinery to employees represented by Local 150. <br />WINTER MAINTENANCE: Shop rates for operators shall be in effect from December 1st to April 1st, which rate <br />shall be: (This clause does not apply to Mechanics.) <br />6117 611118 611119 <br />$26.05 $26.45 $26.85 <br />PERMANENT SHOP MECHANICS: Welders - Mechanics working in a permanent shop. When such mechanics work as <br />field mechanics, they shall receive a field mechanic's rate of pay for the entire day. Permanent shop mechanic - welder <br />rates do not apply to construction sites or shops adjacent to construction sites. Wage rate for Permanent Shop <br />Mechanic Welder will be: <br />HAZMAT PAY <br />6117 611118 611119 <br />$27.05 $27.45 $27.85 <br />LEVEL A $3.00 ABOVE CLASS I <br />LEVEL B $2.00 ABOVE CLASS I <br />LEVEL C & D $1.00 ABOVE CLASS I <br />17 <br />MICHIANA BUILDERS ASSOCIATION INC <br />FINAL <br />DFAGAN.JGARDNER.NCLINE <br />MAY 19, 2017 mlc <br />
The URL can be used to link to this page
Your browser does not support the video tag.