Laserfiche WebLink
to the stamping, stenciling, staining, acid etching, coloring dusting, <br />dusting washing (for the finishing process only), and release agents <br />applied to concrete under 28 days old, finishing, washing, curing, and <br />release agents for all concrete coatings and toppings and all work <br />pertaining to polishing all types of concrete under 28 days old, and all <br />work for which it has been given jurisdiction as determined by the last. <br />The rodding of all concrete and finishing of all top materials, sills, <br />coping, steps, stairs, and risers and running all cement and plastic <br />material six (6") inch base or less, preparatory work on concrete <br />construction, such as cutting of nails, wires, wall ties, etc., where <br />patching, finishing and/or waterproofing if done by trowel is <br />necessary, patching, brushing, chipping, and bushhammering, rubbing <br />or grinding if done by machine or carborundum stone, and the settle of <br />all strips, screeds, stakes, grades, curb forms, and any bulkhead that is <br />a single board in height and that has no keyway attached or which is <br />not notched and fitted, curb forms regardless of boards or regardless of <br />height, shall be set, braced or staked by the Cement Mason. All glass, <br />metal base plates and other materials, set in cement. The laying and <br />finishing of gypsum roofs and floors. The screening, finishing, <br />rubbing, grouting, pointing and patching of all prefabricated and <br />prestressed concrete construction on the job or transported to the job <br />from shops, such as sidewalks, steps, floor or roof slabs, beams, joists, <br />walls, and columns. All cement-mix-drypacking including tilt -up <br />concrete construction. The curing of finished concrete if done by <br />chemical compound and if done within twenty-four (24) hours after <br />finishing. The spreading, screading, darbying, floating or trowel <br />finishing of all types of magnesium, oxychioride, cement composition <br />floors, including all types of oxychioride, granolithic or terrazzo <br />composition floors, hand grinding or machine grinding. The <br />preparation of all floor surfaces, bonding, preparation and installation <br />of ground or base courses, steps, and cove base. The waterproofing of <br />all concrete by theroseal. Ironite and plasterweld and similar <br />materials, irrespective of tools, methods or colors utilized. Setting of <br />all expansion material when set to a grade in floors, walks, and <br />driveways. Gunnite when one and one-half (1 1/z") inches or less, and <br />all drypacking and grouting. <br />(b) The last paragraph (a) does not include any work done in and by <br />the usual method of plastering or shop craft. <br />(c) Pervious concrete all tamping, floating and leveling of all formed <br />or hard edges, all rodding, screeding or use of roller screeds to bring to <br />an elevation. All spraying of all surfaces for hydration control and all <br />material used in that application. All control joints either hand cut or <br />mechanical. <br />5 <br />