My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Vested Interest Building Roof Repair Project 119-049 - Midland Engineering Company
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Award Bids
>
Award Bid - Vested Interest Building Roof Repair Project 119-049 - Midland Engineering Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:45:06 AM
Creation date
9/25/2019 2:55:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO:. Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Charlotte Brach <br />SUBJECT: Vested Interest Building Roof Repair, Project 119-049 <br />DATE: September 17, 2019 <br />fW!wl0liouWwlilililiWm!w01i�LLNY0101010101i1�ili@. t�glh,WIpWWWMIWUUW'JdeINrvN,NitlJU�Y00000WOW'mNWG�11N uu';,mmii b;AYNu4�9Mi��N/ Nd4Y4.,nuumu nr�dux mmuumu l�""»'u'uuwmm�mmlm�w�ullll!';rv0uuw Iililililili00100i1 ,. p�W�u,MHfiU 001BA00°J9°Jf0000iWdM0�qu0uuw¢U�Wtl �nd�ramamvPSAYmw.whxwe�nfwWu�pv�Yurytil�Wrt&m�g <br />On September 10, 2019, the Board of Public Works opened and read bids for the above project. <br />The bidders ranked as follows: <br />The Base Bid for this project specified Sikaplan roofing material, or approved equal. The <br />addendum added another option: Carlisle Sure -Flex KEE HP roofing material, or approved <br />equal. This was added to provide the City with another option for potential cost savings, but it <br />was not considered equal to the Base Bid. Bidders were not required to bid on both the Base Bid <br />and the Alternate. Joe Dzierla reviewed the bids and recommended awarding the Base Bid to <br />Midland Engineering. The Sika Corporation has a track record of proven performance of over 50 <br />years. The Carlisle System is a newer product and does not have a track record of proven <br />performance. There is no equal to the longevity and performance of the Sikaplan Systems, and <br />these systems come with a 15 year warranty, which adds long-term cost savings. Joe Dzierla <br />provided a recommendation letter, which is attached. <br />Engineering recommends award of a contract for 226 00.00 to Midland Engineering, <br />contingent on approval of additional funding to be requested by the Redevelopment Commission <br />on September 26, 2019. <br />The Department of Public Works has appropriated funds from RWDA TIF 024.1050.460.42.02 <br />Please call with your questions. <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.