My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Morris Theater Handrails Project No 119-074 - Larson Danielson Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - Morris Theater Handrails Project No 119-074 - Larson Danielson Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:11:17 PM
Creation date
9/11/2019 10:37:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RO <br />NI N 302 Tyler Street - LaPorte, Indiana 46350 <br />ConsftWtion, Comp , Inc. . (219) 362-2127 • Fax (219) 362-2848 <br />QUAUTY CON UCTIONI SINCE 1900 <br />The City of South Bend <br />Bid Clarification Sheet 9/ 10/ 19 <br />Morris Theater Handrails <br />1. Base bid includes an estimate cost of $130.00 for permit fees. Adjustment to the final cost may change <br />once final permit fee is determined. <br />2. Excludes performance bond costs. <br />3. Sales tax is excluded. <br />4. Liquidated damages are excluded. <br />S. Costs are figured for 8 hours shifts, 5 days a week. <br />6. Anticipated construction completion is 9 weeks from commencement of work. Award of contract would <br />need to be on or before September 13th to allow for 7 weeks for creation of shop drawings & approval <br />(1/2 week), fabrication, paint & delivery (5 weeks) & installation (1 1/2 weeks). Larson Danielson and <br />subcontractor would not be responsible if there is a delay to the approval of shop drawings. <br />7. The November 15th , 2019 completion date is for the Base Bid only. The Alternates provided would <br />require additional time for procurement and installation of materials. <br />8. The Morris Theater would need to accommodate for parking and storage of materials during construction. <br />9. The Morris Theater is to provide any hardware that is not re -usable when dis-assembly & re -assembly of <br />chairs. <br />www.ldconstruction.com Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.