My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Morris Theater Handrails Project No 119-074 - Brown and Brown General Contractors Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - Morris Theater Handrails Project No 119-074 - Brown and Brown General Contractors Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:11:09 PM
Creation date
9/11/2019 10:36:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA* <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />ISO <br />PROJECT NAME: Morris Theater Handrails <br />PROJECT NO. 119-074 <br />--- -------- <br />QUOTES DUE September 10, 2019 9:30 am local time <br />(Must be completed for all quotes. Please type or print) <br />Date: Sept. 10, 2019 Firm: Brown & Brown General Contractors, Inc. <br />Address: 124 S. Elkhart St., PO Box 487 <br />_.._._ ____ .......� <br />City/State/Zip: Wakarusa, IN 46573 Telephone Number (574 ) 862-2171 <br />Agent of Bidder (if Applicable): „ <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Morris Theater Handrails <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />_..._fSo9t%The rarl atrrecPublic Works <br />w <br />2019 <br />and dated Aug-.................°.....................................................................�� <br />for the sum of (enter the Total Quote as shown on the Proposal) <br />Eighty six thousand eight hundred thirty-eight and 00/100($ 86,838.00 <br />(Enter Summ Total Quote plusWAlternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If thq quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />BYw...____......... . <br />(Signature) <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />Laura L. O'Sullivan, Member <br />Eric Brown, President <br />(Printed Name ofITPerson mSigning) <br />ACCEPTANCE <br />day of ___ ._____ 20 <br />Genevieve E. Miller, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />Version 4/2/2019 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.