Laserfiche WebLink
J.W.WERNTZ & SON INC. <br />WERNTZ SUPPLY / WERNTZ GLASS <br />1002 KERR ST. SOUTH BEND IN. 46601 574-232-4881, FAX 233-705 <br />08/29/2019 <br />Proposal for Glass and Glazing <br />Project: CENTURY CENTER <br />We propose to make repairs to the existing Kawneer doors. <br />Remove all three doors and deliver to our shop in South Bend <br />Install temporary wall using studs and plywood. Includes temporary Egress door. Please advise if fire <br />treated material is required (additional cost) <br />Remove, inspect and replace fasteners as needed to make like new function. <br />Replace roller assemblies as needed. We are confident that these are not the tandem Rockwell 5533925. <br />These rollers have to accommodate the curve In the track. The rollers are most likely the 91282 or 92172 <br />Kawneer. This is an expensive roller assembly. <br />Remove and refurbish panel line exit device, concealed door closers, deadlocks. We assume that the door <br />closers and Exit devices do not need to be replaced. We are knowledgeable and have most repair parts <br />needs. These are very expensive! <br />Clean and repair top and bottom track. We assume the existing material is still in good condition. We not <br />included an allowance for replacement. <br />Replace thresholds and weatherstrip as needed. <br />Material. <br />Lift, lumber, sealants,rolIers,exit parts, closer parts, fasteners, thresholds, weatherstrip, tools, hinges. <br />$ 12,890.00 <br />Labor including shop fabrication $ 44,750.00 <br />Total excluding sales tax $ 57,640.00 <br />Excludes. Bond, liquidated damages. <br />n t J )i!., <br />