My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - VPA Restroom Remodeling Project No 118-043R - Michiana Contracting Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 2 - VPA Restroom Remodeling Project No 118-043R - Michiana Contracting Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:54:58 PM
Creation date
9/11/2019 10:15:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />Mailing Address <br />P.O. Box 929 <br />Plymouth, IN 46563 <br />8/28/19 <br />City of South Bend <br />Mr. Greg McGowen <br />227 W. Jefferson Blvd. <br />South Bend, IN 46601 <br />RE: Project No. 118-043R Venues, Parks and Arts Restroom Remodeling Contract Time <br />Extension Due to Design Issues <br />Mr. McGowen, <br />As you are aware, Michiana Contracting has encountered numerous issues throughout this <br />project that have caused delays. Below is a brief summary of these delays. <br />Pinhook Park: Plumbing issues were discovered in March following DA Dodd's arrival at this <br />location. Following an on -site meeting it was determined that additional work was <br />requested which included: <br />• Demolition of the existing cast iron pipe (lead joints ) and carriers <br />• Furnish and install new carriers for the water closets in the new locations. <br />• Furnish excavation as required for the underground connections as required. <br />• Furnish and install new drain and vent piping in chase (WE intend to reuse existing water <br />piping where possible) <br />• Cut concrete floor were needed in chase and repour. <br />Pricing for this additional work was submitted on 4-1-19 and again on 6/7/19. A change order <br />for this work wasn't approved until 7/9/19. As a result, work at this location was delayed by 100 <br />calendar days. <br />Kennedy Park: When DA Dodd arrived on site to check they turned the water on to check the <br />existing system. Upon doing so it was determined that the both the existing water and sewer <br />piping was failing. Following an on -site meeting it was determined that additional work was <br />requested which included: <br />• Disconnect existing chase piping and prepare piping for selective demolition. Run a camera down <br />the existing drainpipe and verify the condition prior to connecting new pipe. <br />• Furnish and install new sanitary piping (PVC) connect to existing as available. <br />• Furnish excavation for new underground sanitary piping connection. <br />MICHIANA CONTRACTING, INC. - PO Box 929 Plymouth, IN 46563 - Tel: 574-936-8613 Fax: 574-936-6201 <br />.nnichiianacontracti g.,&R�wLi <br />
The URL can be used to link to this page
Your browser does not support the video tag.