My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Danch Harner & Assoc - Small Drainage Design and Repair Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 1 to PSA - Danch Harner & Assoc - Small Drainage Design and Repair Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:18:07 PM
Creation date
9/11/2019 9:25:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 6 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated June 5, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data. <br />a. Effective Date of Owner -Engineer Agreement: June 5, 2018 <br />b. Owner: Board of Public Works, City of South Bend,Indiana <br />C. Engineer: Danch, Harper, & Assoc. Inc. <br />d. Project: Small Drainage Projects <br />2. Description of Modifications.⢠<br />[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to <br />this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity <br />with respect to the modifications to be made. Use paragraph numbers in this document for ease of <br />reference herein and in future correspondence or amendments.] <br />a. Engineer shall perform or furnish the following Additional Services: <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: Provide additional topographic survey information, provide additional <br />engineering design services and provide planning services for acquiring <br />easement(s) from affected property owners and revising report for engineering <br />design and specifications, construction plans and specifications, and cost estimate <br />for bids of the above -mentioned project of Overlook Court. Detailed scope of <br />services are provided in Exhibit IA. <br />The responsibilities of Owner are modified as follows: <br />d® For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensate <br />$21,270 (minus remaining $2,190 from Lafayette Falls), equivalent to $19,080. <br />e, The schedule for rendering services is modified as follows: Upon acceptance of <br />of Amendment, Engineer will commence with additional topographic survey and <br />begin planning services for easement legal preparation, easement negotiations, <br />Page 1 <br />(Exhibit Kâ (Amendment to Owner -Engineer Agreement) â Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.