Laserfiche WebLink
Performance <br />Services <br />Executive Summary <br />This Year 1 Annual Savings Report summarizes the system performance and energy savings from <br />January 2018 through December 2018 for the Delphi Community School Corporation Solar and LED <br />Project. <br />Project Overview <br />In the fall of 2017, Performance Services, Inc. (PSI) completed the installation of Energy Conservation <br />Measures (ECMs) at Delphi Community School Corporation. The ECMs consisted of upgrading over 4,000 <br />fluorescent light fixtures throughout the campus with LED fixtures and installing two (2) large scale <br />ground mounted solar photovoltaic (PV) systems at Delphi Community Middle/High School and Delphi <br />Community Elementary/Armory Building. <br />• Light fixtures upgraded — qty. 2681 <br />• PV System Size: 1.27 MW-DC <br />0 320W Jinko Solar panels —qty. 3960 <br />o Solar Edge Inverters — qty. 30 <br />Figure 1: Delphi Community Middle School and <br />High School <br />Delphi Community Elementar Armo Building <br />• Light fixtures upgraded — qty. 1298 <br />• PV System Size: 398 kW -DC <br />0 320W Jinko Solar panels — qty. 1244 <br />o Solar Edge Inverters — city. 12 <br />Figure 2; Delphi Community Elementary/Armory <br />Building <br />• Light fixtures upgraded — qty. 59 <br />Delphi United School Corporation Year 1 Savings Report - 1 <br />