Laserfiche WebLink
Performance <br />Services <br />jchristie@performanceservices.com <br />www.performanceservices.com <br />II Ileum C llhl Illl l` S t i t <br />BUSINESS DEVELOPMENT MANAGER <br />Jim is an excellent customer advocate and brings 22 years of business development <br />experience to his role at Performance Services. Having held various positions within <br />GE Healthcare, he has a global understanding of the challenges and solutions facing <br />customers today. Jim has the ability to understand his customers and has a true <br />concern for taking care of them. He was recognized for this ability at GE where he <br />achieved President's Club six times and earned the 2005 sales professional of the <br />year for the Americas. At Performance Services, Jim has helped 18 customers achieve <br />energy and operational savings through energy savings performance contracting , <br />integrated design and delivery, design -build and progressive design -build. <br />PROJECT HIGHLIGHTS <br />III o ui°°f yya yui°itrw t.wraui°°ui tuyu°ytrrur i°iity Illui : anlllmr:, 0 i 7 <br />Total Contracts: $9,346,737 (Guaranteed Energy Savings Phases II -IV) <br />HVAC and LED Lighting replacement in multiple buildings <br />&:d�,cafla Adaiiii s ScIlitools, 2017 �:--tu id 20 ] t:�a <br />Total Contract: $3,374,661 (Progressive Design -Build Phase 2 and 3) <br />High school renovation project <br />City of IIl1wcsl,willWe, 2018 <br />Total Contracts, Ph.1-11: $4,142,000 (Progressive Design -Build) <br />• Renovation project with ADA component project <br />City of Gairurett, .2018 <br />Total Contracts: $304,847 (Guaranteed Energy Savings) <br />• HVAC and LED lighting upgrades <br />11Ji III°°Ie altlllru, Metll[tcAc)iiist III°°Iospiiiia1, 20'N 201 <br />Total Contract, Ph.1-III: $5,693,341 (Integrated Design & Delivery) <br />• Installation of key environmental equipment, control system components, and sequence programming in 20 <br />operating room suites that provide specific temperature, hUr-nldity, and pressurization control <br />• indoor environmental quality for OR meets or exceeds code requirements and comfort needs <br />• 1 million kWh of electricity saved annually while improving infection control <br />�cffcroi°at t.,tuirtivei sity, 2017 <br />t°f �u�t uc°�tfui ui �i . <br />Total Contract: $2,900,000 (Guaranteed Energy Savings) <br />• $300,000 measured & verified annual energy savings with $350,000 inutility incentives <br />• LED lighting replacement, integration of multiple control platforms into single Tridium front end, replacement of <br />boilers and chillers <br />EDUCATION <br />t.aoPafUe ihni ve silty - Mechanical Engineering and Cooperative Education, 1988 <br />CERTIFICATIONS <br />Sliie Sliigina Blaclk II'te^lt Certified <br />MEM <br />ASSOCIATIONS BEST <br />Design -Build Institute of America (DBIA) Great Lakes Region Board of Directors NDUM <br />Indiana Society for Healthcare Engineers (ISHE) - Associated Board Member OF <br />Indiana Association of School Business Officials <br />