My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ - SBFD Solar PV - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
RFQ - SBFD Solar PV - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:19:26 PM
Creation date
8/28/2019 11:10:11 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ERESCO4 <br />�arrc, �V'ni f...0oa V <br />Ameresco has determined that the actual energy savings achieved from this project during year 1 of the <br />Guarantee Period are $46,815. This means that the energy savings Guarantee of $45,118 was exceeded by <br />$1,697. Along with the Operating Cost Savings of $203,431, the year 1 savings total is $250,246. The county <br />can expect to achieve these savings throughout the project term through the continued practice of using the <br />same equipment for repairs when necessary, and by operating at the parameters specified in the Amendment. <br />Ameresco performed a measurement and verification site visit on August 22nd, 2018 to inspect and monitor <br />the ECMs. Additionally, Ameresco has remotely monitored the building automation system in order to ensure <br />that the systems were operating as intended. It is recommended that operating schedules at the Government <br />Center be reduced where possible. <br />Please notify Ameresco within 45 days of the receipt of this report if the county desires to continue M&V <br />Services. Ameresco will then submit an Invoice for $46635 and begin to perform the M&V Services for the <br />year 2 reporting period, which will cover the period of December 1", 2018 through November 301h, 2019. <br />Please do not hesitate to contact Ameresco if there are any questions about this project or about any of the <br />information contained within this report. <br />Submitted by: <br />Greg Studier, CMVP <br />Measurement and Verification Engineer <br />gstudier@ameresco.com <br />Hendricks County, IN <br />March 200, 2019 <br />City of South Bend — August 27, 2019 <br />Tlage content is subject to Confidentiality Restrictions" <br />52 11. Measurement g Verification <br />
The URL can be used to link to this page
Your browser does not support the video tag.