My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ - SBFD Solar PV - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
RFQ - SBFD Solar PV - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:19:26 PM
Creation date
8/28/2019 11:10:11 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AME�RESCO40 <br />Gret..,lrm - COean m u%tanalbla <br />Verificationof SavI — The savings for this ECM were reviewed following the ECM Construction and <br />Performance Verification plan as defined in Exhibit G-1 of the Amendment. The savings have been achieved <br />based on completion of the upgrade. Upon delivered functional capability as documented during the <br />commissioning and closeout process, the savings associated with the controls upgrade were deemed achieved. <br />The new controls system was commissioned during project closeout to confirm that all of the equipment was <br />being controlled as expected. The building automation system was used to verify that the control strategies <br />were implemented and operating as expected. Additionally, the project site was surveyed to confirm that the <br />equipment was installed in conformance with the Scope of Services. <br />Ameresco has remotely monitored the building automation system during the performance period. While the <br />data indicates that the equipment is being controlled as anticipated, the building schedules are exceeding the <br />expected operating hours per week. As shown in Exhibit G-1 of the Amendment, the expected daily equipment <br />operation was 6AM-6PM Monday -Friday, or 60 hours per week. The screenshot below shows that the <br />equipment is currently operating 114 hours per week. It is recommended that the building schedules be <br />reduced as close as possible to 60 hours per week of operation so that the full value of this ECM can be realized. <br />WV klyachedu!e Special E—t. I Summery <br />t ; Jfl <br />® a <br />Hendricks Counl ,IN <br />Sun Igor Iue !,Ned Thu n ,_sal. <br />March 2V1, 2019 <br />M <br />Em <br />City of South lBend August 27, 2019 40 11. Measurement g Verification <br />Tacfe content is subject to ConfidentialltV Restrictions" <br />
The URL can be used to link to this page
Your browser does not support the video tag.