Laserfiche WebLink
Energy Performance Contracting Services <br />EDUCATION <br />Stanford University <br />MS, Civil/Environmental Engineering <br />LICENSES AND <br />CERTIFICATIONS <br />AutoCAD, MATLAB, Excel, PVSyst, <br />NREL SAM, Java, and Python C <br />PROFESSIONAL EXPERIENCE <br />Ameresco, Inc., 2018 — Present <br />Sr. Project Development Engineer <br />Luminate, 2016 — 2018 <br />Manager — Solar Energy Group <br />SunEdison, 2014 — 2016 <br />Utility Development Engineer <br />Alta Energy Inc., 2011 — 2014 <br />Manager of Engineering & <br />Analytics <br />Rocky Mountain Institute <br />Electricity Practice Fellow <br />PROJECT ROIt.IE <br />Mr. Hart will lead solar performance engineering" <br />and the energy estimation team. He will conduct <br />f - <br />solar energy modeling, including setting <br />standards and vetting <br />assumptions. Chris is responsible for <br />creating new tools and processes consistent with the latest industry <br />techniques, including bifacial modules and battery storage. Chris <br />will perform energy estimates on solar photovoltaic projects <br />ranging in size from 100kW to 100+MW. He will perform Measure, <br />Correlate, Predict (MCP) studies using ground -measured and <br />satellite irradiance data. He will also analyze plant operational data <br />to verify project performance and identify opportunities for <br />improvement. He is part of a team that reviews various solar <br />technologies (modules, inverters, etc.) and opines on their useful <br />life and degradation. Chris is responsible for construction <br />monitoring to ensure adequacy of utility solar construction sites. He <br />creates energy estimates using PVSyst and personalized tools to <br />account for site -specific complexities. <br />PROJECT EXPERIENCE <br />Four Brothers Solar Projects, Cedar City, UT <br />Acted as the development engineer for the design and optimization of the <br />plant located in rural Utah, The candidate worked on rnuiYtiple design <br />iterations In order to optimize the 320MWac plant, and participated in the <br />project financing, He performed a measure, correlate„ predict irradiance <br />study on the site using collected meteorological data, which was used in <br />the financing. <br />Pinal Solar Project, Pinal, AZ <br />Space Systems/Loral, 2006 — The candidate acted as a consultant during the design and development <br />2009 of the 20MWac solar plus battery storage project. He performed the <br />energy estimate on both the solar and battery storage components, <br />Orbit Dynamics Engineer creating a custorn software tool to analyze the battery design and <br />performance at the site, <br />Westfield Century City Solar Project, Los Angeles, CA <br />Development and early engineering of the 00+ kW rooftop installation. A <br />particularly complex development and permitting process involving <br />multiple stakeholders slowed development, but eventually the site was <br />interconnected and has been operating since 2015. <br />City of �wkdh Bend ,-, August 27, 20,19 23 7 IPersoi oaaV QUafiflcaflm�6 <br />"Pay,' e a°mte'nt y°s suble l: to C¢.flnfiden iahtyp Re str'ictoa:mins' <br />