My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lateral Proposal - St Joe Valley Metronet - Tech Resource Center Metronet Buildout
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Lateral Proposal - St Joe Valley Metronet - Tech Resource Center Metronet Buildout
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:49:45 PM
Creation date
8/28/2019 10:26:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
METRONCT <br />Lateral Proposal <br />City of South Bend <br />227 W. Jefferson #1200N <br />South Bend, Indiana, 46601 <br />1165 Franklin St. <br />Proposal for new conduit and fiber at Technology Resource Center: <br />St. Joe Valley Metronet, Inc, <br />130 S. Main Street, Ste 275 <br />South Bend, IN 46601 <br />August 14, 2019 <br />• Install Corning 24 strand fiber from Franklin to the building. <br />• Terminate 4 strands to SC type connectors into a new fiber panel. <br />• Test and Label lateral fiber. <br />• Splice fiber into backbone. <br />• Proposal does not include Indiana sales tax. <br />• Work quoted first shift 7:00 AM to 3:30 PM <br />• Install 2-inch HDPE from Franklin to the South end of the building. <br />• Rough -in conduit into building. <br />• Rough -in conduit into the handhole. <br />• Proposal does not include Indiana sales tax. <br />We hereby propose to furnish material and labor in complete accordance with the above <br />specifications for the sum of $ 9,200 (Nine Thousand Two Hundred Dollars) <br />All materials are guaranteed to be as specified. All work to be completed in a satisfactory <br />manner according to standard practices. Any alteration or deviation from the above <br />specifications or involving extra costs will be executed only upon written orders and will become <br />an extra charge over and above this proposal. All agreements are contingent upon strikes, <br />accidents, or delays beyond our control. The Owner will carry fire, tornado, and other necessary <br />insurance. Our workers are fully covered by Worker's Compensation Insurance. This proposal is <br />valid for 30 days from issue date. <br />ACCEPTANCE OF PROPOSAL <br />The above prices, specifications, and conditions are satisfactory and are hereby accepted. SJVM, Inc. is <br />authorized to do the work as specified. Payment will be made as stated above. <br />The undersigned person executing this Proposal represents and certifies that he/she is a duly authorized <br />officer with authority to execute this Proposal and has the full legal rights, power and authority to enter <br />into this Proposal and to grant the rights and perform the obligation herein; that no third party consent or <br />approval is required to grant such right or perform such obligations hereunder. <br />3001"d <br />Signature. .......... -- —..... Daft; <br />i <br />St, Joe Valley Metronet, Inc. 7 ' 1 <br />wyyrw h�tet,r�ar;wt,t.iu�tq rtp w <br />Rev. 11/13/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.