My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Century Center Upgrades and Renovations Project No 118-104AR - R Yoder Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 2 - Century Center Upgrades and Renovations Project No 118-104AR - R Yoder Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:53:03 PM
Creation date
8/28/2019 10:23:30 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�r <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 118-104AR Project Name: Century Center Upgrades &Renovations Change Order #: ? <br />DATE INITIATED:8/01/2019 BPW DATE:1V <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Cost for additional/unforeseen flooring materials. <br />Attachments: (List documents support change — required) <br />Contractor's cost estimate. <br />Signed PCR #2 <br />Amount of B Increase / ❑ Decrease: $ 6, 605.00 <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 8,075.00 8 Scope of Work <br />❑ Differing Site Conditions, Changed Conditions <br />Current Percent of Change: 6.77 % ❑ Conflicted Specifications and Drawings <br />�El Failed Materials <br />New Total Amount: $104,180.00 <br />❑ Error <br />16.40 El Omission <br />Total Percent of Change: _ _...._ % ❑ Final Quantity Adjustment <br />Funding Secured From: ❑ <br />(filled out by PM) <br />RECOMMENDED BY: <br />CroJAW Iq-�q <br />Project Inspector (Print Name) nature) (Date) <br />REVIEWED BY: <br />Construction Manager (Print Name) (Signature) _ (Date) <br />APPROVED BY: <br />be-U& — z 9:: � L 61, e-1 <br />Engineering Project Manager (Print Name) (Signature) (Date) <br />APPROVE BY: <br />City Engineer (Print Name) (Signatur) (Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.