My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1-PCA - Small Drainage Design and Repair Project No 118-063 - GE Marshall
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Order & Project Completion Affidavits
>
Change Order No 1-PCA - Small Drainage Design and Repair Project No 118-063 - GE Marshall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:03:02 AM
Creation date
8/28/2019 10:22:56 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bond No: MNT 7659093 <br />Maintenance Bond <br />KNOW ALL MEN BY THESE PRESENTS, that we <br />G.E. Marshall, Inc. hereinafter <br />called Principal, as Principal, and Fideli and Deposit Com an of Ma land <br />a corporation of the State of I L , Schaupnbura ILr_ , hereinafter called Surety, as Surety, <br />are held and firmly bound unto <br />City of South Bend Indiana,,Board of Public Works <br />hereinafter called Obligee in the sum of Eleven Thousand Seven Hundred Ten Dollars and 65/100 $11,710.65 <br />DOLLARS, lawful money of the United States of America, to be paid to the said Obligee, or its successors or assigns, to <br />the payment of which sum well and truly to be made, we do bind ourselves, our heirs, executors, administrators, <br />successors and assigns, jointly and severally, firmly by these presents. <br />SIGNED, sealed and dated this 6th day of August 1 9 2019 , <br />WHEREAS, the Principal entered into a contract with the said Obligee, dated December 20 2018 <br />for <br />Small Drainage Design and Re air, Pro ect No. 118-063 <br />and, <br />WHEREAS, the Obligee requires that these presents be executed on or before the final completion and acceptance of said <br />contract and <br />WHEREAS, said contract was completed and accepted on the 25th day of July 1 2019 . <br />NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall remedy, without <br />cost to the Obligee, any defects which may develop during a period of three (3) years <br />from the date of completion and acceptance of the work performed under the contract, caused by defects "aadt�: <br />materials or workmanship, then this obligation shall be void:. otherwise it shall be and. remain in full forcew �� <br />4v.. oRpo J <br />Kathryn R. Posima <br />CON800107Z0601 f <br />G.E. Marshall.Alnc, 1 SEAL M` <br />F tak Marshall, President , VEPO10 <br />Fidelity and Deposit Company of Ma la <br />.4 ra <br />By: IO <br />David M. Oliger , Attorn act., <br />
The URL can be used to link to this page
Your browser does not support the video tag.