My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Century Center Site Signs Project No 118-035B - Burkhart Sign Systems
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Century Center Site Signs Project No 118-035B - Burkhart Sign Systems
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:14:48 AM
Creation date
8/28/2019 10:21:50 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />118-0356 Century Center Site Signs 1 <br />Project Number: Project Name: Change Order #: <br />DATE INITIATED:7/25/19 - BPW DATE' <br />Brief Summary of Change Order; (Construction Change, Alternative, tive, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Out of Scope- Additional materials required for installation of skywalk sign. <br />Attachments: (List documents support change — required) <br />1- Cost and explanation from Contractor. <br />2- PCR #1 - signed by Contractor. <br />Amount of OIncrease / ❑ Decrease: $ 2600.00 <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 0 [s] Scope of Work <br />.._ _............ El Differing Site Conditions, Changed Conditions <br />Current Percent of Change: 1.74 <br />❑Conflicted Specifications and Drawings <br />El Failed Materials <br />New Total Amount: $152,030.00 <br />.................. .. ❑ Error <br />� El Omission <br />Total Perce <br />nt of Change„ 1.74 <br />❑ Final Quantity Adjustment <br />Funding Secured From. .'_""" <br />(Filled out by PM) <br />RECOMMENDED BY: <br />Greg McGowan �- 8/7/19 <br />Project Inspector (Print Name) Jgn� ture) (Date) <br />REVIEWED BY: <br />0 LA at <br />Manager (Print Name) (Si -- <br />_._ <br />Construction Mali (Signature) (Date) <br />APPROVED BY: <br />Engineering Project Manager (Print Name) _ (Signature) _ (D .tet r) <br />APPRO ED BY: <br />City Engineer (Print N me) (Sign tt re) ((7at ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.