My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 3 to PSA - Arcadis US Inc - Services for WWTP Secondary Treatment Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 3 to PSA - Arcadis US Inc - Services for WWTP Secondary Treatment Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:21:10 PM
Creation date
8/28/2019 10:17:31 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 2 of 3 <br />Between City of South Bend and ARCADIS U.S., Inc. Proiect Number: 03029034.0000 <br />AMENDMENT No. 3 <br />Schedule A-1 <br />Scope of Amended Services and Related Matters <br />ENGINEERING SERVICES BY ARCADIS <br />General Administration: Arcadis provided general administration services related to clarifications and interpretations (5 <br />additional RFIs), change orders (44 additional change requests resulting in 6 approved change orders), and other matters <br />to fully close the project. Arcadis provided services through the Contractor's extended schedule as further described <br />below. This also includes reconciling Arcadis' subconsultants for their time and materials spent, which was less than <br />anticipated for CMID and more than anticipated for Donohue (assumed low range of their anticipated budget at a key <br />design stage), with an overall net increase which cut into Arcadis' budget for services provided through the entire project, <br />especially as it related to services associated with changes and the claim as part of the project. <br />Meetings and Site Visits: Arcadis attended meetings and observed the progress of Contractor's executed work during <br />same visits, which extended beyond the anticipated Substantial Completion date of March 8, 2018 as noted in the previous <br />Amendment No. 2. The Contractor's work was substantially complete in November 2018 with additional close-out items <br />occurring through December 2018. This was approximately 10 months of additional schedule. <br />Record Drawings: Arcadis and its subconsultants provided additional services to incorporate the numerous substitutions <br />that were accepted during construction for cost savings into the record drawings. <br />South Bend Secondary Improvements CA Amendment No. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.