Laserfiche WebLink
Ulmnd�ch <br />9�A� <br />Water <br />Scientists <br />Environment <br />I Engineers <br />Labor Billing Rates <br />Cate2ory <br />Principal/Sr. Scientist <br />Principal / Officer/Sr. Scientist <br />Senior Engineer/Scientist <br />Senior Project <br />Engineer/Scientist II <br />Senior Project <br />Engineer/Scientist I <br />Project Engineer/Scientist III <br />Project Engineer/Scientist II <br />Project Engineer/Scientist I <br />Engineer/Scientist <br />Environmental Specialist <br />Field Supervisor <br />Clerical/Ast. Project Mgr. <br />501 Avis Drive <br />Ann Arbor, MI 48108 <br />734.332.1200 <br />www.limno.com <br />Effective January 1, 2019 <br />Rate $/hr.*,** <br />240 <br />04111 <br />195 <br />175 <br />165 <br />150 <br />130 <br />120 <br />100 <br />100 <br />115 <br />72 <br />*Hourly billable rates do not include direct billable costs such as supplies, equipment and computer user <br />fees, rental costs, facsimile, reproduction, special postage, laboratory charges, subcontractors, <br />subconsultants, and 10% administrative fee on direct costs. <br />**Specific litigation technical support services, including depositions and testimony, are billed at 150% of <br />the above labor rates. <br />