Laserfiche WebLink
QUOTE/PROPOSAL , <br />CITY OF SOUTH BEND <br />PROJECT NAME: City of South Bend Wa finding Signage Program — Phase 1 <br />PROJECT NO. 119-052 <br />QUOTES DUE August 13, 2019 @ 9:30am local time <br />Item <br />No. <br />Description <br />QTY <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />MOBILIZATION AND <br />1 <br />LS <br />18, 600.00 <br />DEMOBILIZATION <br />2 <br />PAVEMENT, REMOVE <br />35 <br />SYS <br />3800.00 <br />3 <br />COMMON EXCAVATION, <br />52 <br />CYS <br />9720.00 <br />UNDISTRIBUTED <br />4 <br />EXISTING BRICK PAVER, <br />4 <br />SYS <br />1400.00 <br />REMOVE AND REPLACE <br />5 <br />NEW 5" CONCRETE SIDEWALK <br />35 <br />SYS <br />4150.00 <br />6 <br />Gx-1 VEHICULAR GUIDE 6" SIGN <br />2 <br />EACH <br />4410.00 <br />8820.00 <br />ASSEMBLY <br />Ix-2 GATEWAY GUIDE SIGN <br />1 <br />EACH <br />4880.00 <br />4880.00 <br />ASSEMBLY <br />8 <br />CONCRETE FOUNDATIONS <br />6 <br />EACH <br />475.00 <br />2850.00 <br />W/BREAKAWAY (2 PER SIGN) <br />9 <br />Gx-2 VEHICULAR TRAILBLAZER <br />1 <br />EACH <br />4305.00 <br />4305.00 <br />6" SIGN (ON DECORATIVE POLE) <br />.......�............._ <br />10 <br />Gx-3 VEHICULAR GUIDE 4" SIGN <br />12 <br />EACH <br />7270.00 <br />87240.00 <br />ASSEMBLY <br />11 <br />Gx-4 VEHICULAR TRAILBLAZER <br />3 <br />EACH <br />6352.00 <br />19056.00 <br />5" SIGN ASSEMBLY <br />12 <br />CONCRETE POLE FOUNDATION <br />12 <br />EACH <br />475.00 <br />5700.00 <br />13 <br />PEDESTRIAN KIOSK (ON EXIST <br />FOUNDATION) <br />5 <br />EACH <br />4960.00 <br />24800.00 <br />Total Amount <br />of Quote <br />$195,321.00 <br />Version 4/2/2019 Page - 32 <br />Public Works Quote <br />