My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Century Center Parking Lot Entry Gate Improvements Project No 118-035 - Selge Construction Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - Century Center Parking Lot Entry Gate Improvements Project No 118-035 - Selge Construction Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:48:18 PM
Creation date
8/15/2019 9:10:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />IN65 <br />PROJECT NAME: CENTURY <br />CENTER <br />PARKING <br />LOT ENTRY <br />GATEWAY <br />IMPROVEMENTS <br />PROJECT NO. 118-035 <br />QUOTES DUE -August <br />13, 2019 <br />at 9:30am <br />local time <br />BASE QUOTE <br />Item <br />No. <br />Description <br />Quantit <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />gvl , cx") <br />2 <br />Mobilization & Demobilization <br />. .......... ..... <br />1 <br />LS <br />0 e —, <br />7' I <br />3 <br />Excavation, Common <br />.............. . . <br />222 <br />CYS <br />4 <br />4 <br />Pavement, Remove <br />12 <br />SYS <br />411A r�'� 0 <br />5 <br />Curb, Concrete, Remove <br />150 ............. <br />LFT <br />"Pa' f.1 <br />1�7 <br />6 <br />Attendant Booth, Remove <br />I <br />LS <br />7 <br />Protective Bollard, Remove <br />5 <br />EA <br />8 <br />Sign, Relocate <br />1 <br />EA <br />9 <br />Temporary Inlet Protection <br />3 <br />EA <br />1; 375 <br />10 <br />Compacted Aggregate, No. 53 <br />110 <br />TON <br />"tq 15 rt/0 <br />Lf�;O' <br />11 <br />Curb, Concrete <br />420 <br />LIFT <br />/0' Z) 0 <br />12 <br />Concrete, Reinforced, 6 IN <br />468 <br />SYS <br />13 <br />Single Swing Barrier Gate <br />4 <br />LS <br />11" -1 2 <br />14 <br />Misc. Electrical <br />1 <br />LS <br />- <br />--!LLz <br />15 <br />Electrical Handhole <br />5 <br />EA <br />lob og <br />16 <br />Wire, No. 4 <br />130 <br />LFT <br />fi 0 0 <br />'e)c) <br />17 <br />Conduit, PVC, Schedule 80, 2 IN <br />108 <br />LFT <br />LLI & <br />18 <br />Conduit, PVC, Schedule 80, 3 IN <br />26 <br />LFT <br />o <br />oh <br />19 <br />Conduit, PVC, Schedule 80, 4 IN <br />42 <br />LIFT <br />11 <br />20 <br />_ <br />Line, Thermoplastic, Crosswalk, <br />Solid, White, 6 IN <br />102 <br />LFT <br />21 <br />Line, Thermoplastic, Solid, White, <br />61N <br />46 <br />LFT <br />.......... . <br />22 <br />Line, Epoxy, Solid, White, 6 IN <br />96 <br />LFT <br />23 <br />Parking Lot attendant Booth <br />— <br />1 <br />. . ...... <br />EA <br />47 316 00 00 <br />'I - <br />000 _I06 <br />24 <br />Protective Bollards <br />4 <br />EA <br />(P EI), �Ot) <br />25 <br />Hardwood Mulch, 3 IN Depth <br />14 <br />CYS <br />n3o <br />26.— <br />Irrigation Allowance <br />1 <br />ALLOW <br />$400 <br />- i 2 (21 Z) C _-) <br />IL <br />27 <br />Irrigation Sleeve, PVC, 4 IN <br />45 <br />LFT <br />a <br />go5- <br />BASEQUOTETOTAL <br />$W` <br />Version 4/2/2019 <br />Page - <br />28 <br />Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.