Laserfiche WebLink
44 <br />QUOTE/PROPOSAL00 <br />CITY OF SOUTH BEND <br />PROJECT NAME: CENTURY CENTER PARKING LOT ENTRY GATEWAY <br />IMPROVEMENTS <br />PROJECT NO. 118-035 <br />QUOTES DUE August 13, 2019 at 9:30am local time <br />BASE QUOTE <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />$ 3,000.00 <br />$ 3,000.00 <br />2 <br />Mobilization & Demobilization <br />1 <br />LS <br />$ 9,200.00 <br />$ 9,200.00 <br />3 <br />Excavation, Common <br />222 <br />CYS <br />$ 65.00 <br />$ 14,430.00 <br />4 <br />Pavement, Remove <br />12 <br />SYS <br />$ 200.00 <br />$ 2,400.00 <br />5 <br />Curb, Concrete, Remove <br />150 <br />LFT <br />$ 15.00 <br />$ 2,250.00 <br />6 <br />Attendant Booth, Remove <br />1 <br />LS <br />$ 4,000.00 <br />$ 4,000.00 <br />7 <br />Protective Bollard, Remove <br />5 <br />EA <br />$ 150.00 <br />$ 750.00 <br />8 <br />Sign, Relocate <br />1 <br />EA <br />$ 130.00 <br />$ 130.00 <br />9 <br />Temporary Inlet Protection <br />3 <br />EA <br />$ 100.00 <br />$ 300.00 <br />10 <br />Compacted Aggregate, No. 53 <br />110 <br />TON <br />$ 55.00 <br />$ 6,050.00 <br />11 <br />Curb, Concrete <br />420 <br />LFT <br />$ 45.00 <br />$ 18,900.00 <br />12 <br />Concrete, Reinforced, 6 IN <br />468 <br />SYS <br />$ 89.00 <br />$ 41,652.00 <br />13 <br />Single Swing Barrier Gate <br />4 <br />LS <br />$ 5,400.00 <br />$ 21,600.00 <br />14 <br />Misc. Electrical <br />1 <br />LS <br />$ 3,500.00 <br />$ 3,500.00 <br />15 <br />Electrical Handhole <br />5 <br />EA <br />$ 1,000.00 <br />$ 5,000.00 <br />16 <br />Wire, No. 4 <br />130 <br />LFT <br />$ 7.00 <br />$ 910.00 <br />17 <br />Conduit, PVC, Schedule 80, 21N <br />108 <br />LFT <br />$ 12.00 <br />$ 1,296.00 <br />18 <br />Conduit, PVC, Schedule 80, 31N <br />26 <br />LFT <br />$ 18.00 <br />$ 468.00 <br />19 <br />Conduit, PVC, Schedule 80, 41N <br />42 <br />LFT <br />$ 19.00 <br />$ 798.00 <br />20 <br />Line, Thermoplastic, Crosswalk, <br />102 <br />LFT <br />Solid White 61N <br />$ 8.00 <br />$ 816.00 <br />21 <br />Line, Thermoplastic, Solid, White, <br />46 <br />LFT <br />61N <br />$ 8.00 <br />$ 368.00 <br />22 <br />Line, Epoxy, Solid, White, 61N <br />96 <br />LFT <br />$ 8.00 <br />$ 768.00 <br />23 <br />Parking Lot attendant Booth <br />1 <br />EA <br />$ 20,000.00 <br />$ 20,000.00 <br />24 <br />Protective Bollards <br />4 <br />EA <br />$ 1,000.00 <br />$ 4,000.00 <br />25 <br />Hardwood Mulch, 3 IN Depth <br />14 <br />CYS <br />$ 185.00 <br />$ 2,590.00 <br />26 <br />Irrigation Allowance <br />1 <br />ALLOW <br />$ 400.00 <br />$ 400.00 <br />27 Irrigation Sleeve, PVC, 41N 45 LFT $ 45.00 <br />$ 2,025.00 <br />BASE QUOTE TOTAL <br />$167,601.00 <br />Version 4/2/2019 Page - 28 Public Works Quote <br />