� Qlit
<br />QUOTE/PROPOSAL°
<br />CITY OF SOUTH BEND'
<br />1965
<br />PROJECT NAME: CENTURY CENTER PARKING LOT ENTRY GATEWAY
<br />IMPROVEMENTS
<br />PROJECT NO. 118-035
<br />QUOTES DUE August 13, 2019 at 9:30am local time
<br />BASE QUOTE
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Construction Engineering
<br />1
<br />LS
<br />$
<br />2
<br />Mobilization & Demobilization
<br />1
<br />LS
<br />o15 6
<br />/ ,
<br />3
<br />Excavation, Common
<br />222
<br />CYS
<br />,
<br />4
<br />Pavement, Remove
<br />12
<br />SYS
<br />00
<br />5
<br />Curb, Concrete, Remove
<br />150
<br />LFT
<br />Ifl, q 57
<br />00
<br />6
<br />Attendant Booth, Remove
<br />1
<br />LS
<br />2,017.57,
<br />00
<br />7
<br />Protective Bollard, Remove
<br />5
<br />EA
<br />I
<br />8
<br />Sign, Relocate
<br />1
<br />EA
<br />00
<br />9
<br />Temporary Inlet Protection
<br />3
<br />EA
<br />10
<br />Compacted Aggregate, No. 53
<br />110
<br />TON
<br />/00
<br />11
<br />Curb, Concrete
<br />420
<br />LFT
<br />/
<br />!
<br />12
<br />Concrete, Reinforced, 6 IN
<br />468
<br />SYS
<br />........
<br />13
<br />Single Swing Barrier Gate
<br />4
<br />LS
<br />/, `
<br />14
<br />Misc. Electrical
<br />1
<br />LS
<br />f ` Toq Z4
<br />12, CIO do
<br />15
<br />Electrical Handhole
<br />5
<br />EA
<br />S
<br />.00
<br />16
<br />Wire, No. 4
<br />130
<br />LFT
<br />qj.
<br />d-00
<br />17
<br />Conduit, PVC, Schedule 80, 2 IN
<br />108
<br />LFT
<br />18
<br />Conduit, PVC, Schedule 80, 3 IN
<br />26
<br />LFT
<br />19
<br />Conduit, PVC, Schedule 80, 4 IN
<br />42
<br />LFT
<br />/.00
<br />20
<br />Line, Thermoplastic, Crosswalk,
<br />102
<br />LFT
<br />�._. ___....._ ....
<br />It
<br />Solid White 6 IN
<br />21
<br />Line, Thermoplastic, Solid, White,
<br />46
<br />LFT
<br />........
<br />co
<br />6 IN
<br />°
<br />22
<br />Line, Epoxy, Solid, White, 6 IN
<br />96
<br />LFT
<br />r ,
<br />23
<br />Parking Lot attendant Booth
<br />1
<br />EA
<br />. ........ -.. ._
<br />1 g, ]g. 61
<br />tg, glq
<br />24
<br />Protective Bollards
<br />4
<br />EA
<br />21,7a3
<br />25
<br />Hardwood Mulch, 3 IN Depth
<br />14
<br />CYS
<br />.00
<br />26
<br />Irrigation Allowance
<br />1
<br />ALLOW
<br />$400
<br />27
<br />Irrigation Sleeve, PVC, 4 IN
<br />45
<br />LFT
<br />r
<br />BASE QUOTE TOTAL $ 179,
<br />Version 4/2/2019 Page - 28 Public Works Quote
<br />
|