Laserfiche WebLink
� Qlit <br />QUOTE/PROPOSAL° <br />CITY OF SOUTH BEND' <br />1965 <br />PROJECT NAME: CENTURY CENTER PARKING LOT ENTRY GATEWAY <br />IMPROVEMENTS <br />PROJECT NO. 118-035 <br />QUOTES DUE August 13, 2019 at 9:30am local time <br />BASE QUOTE <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />$ <br />2 <br />Mobilization & Demobilization <br />1 <br />LS <br />o15 6 <br />/ , <br />3 <br />Excavation, Common <br />222 <br />CYS <br />, <br />4 <br />Pavement, Remove <br />12 <br />SYS <br />00 <br />5 <br />Curb, Concrete, Remove <br />150 <br />LFT <br />Ifl, q 57 <br />00 <br />6 <br />Attendant Booth, Remove <br />1 <br />LS <br />2,017.57, <br />00 <br />7 <br />Protective Bollard, Remove <br />5 <br />EA <br />I <br />8 <br />Sign, Relocate <br />1 <br />EA <br />00 <br />9 <br />Temporary Inlet Protection <br />3 <br />EA <br />10 <br />Compacted Aggregate, No. 53 <br />110 <br />TON <br />/00 <br />11 <br />Curb, Concrete <br />420 <br />LFT <br />/ <br />! <br />12 <br />Concrete, Reinforced, 6 IN <br />468 <br />SYS <br />........ <br />13 <br />Single Swing Barrier Gate <br />4 <br />LS <br />/, ` <br />14 <br />Misc. Electrical <br />1 <br />LS <br />f ` Toq Z4 <br />12, CIO do <br />15 <br />Electrical Handhole <br />5 <br />EA <br />S <br />.00 <br />16 <br />Wire, No. 4 <br />130 <br />LFT <br />qj. <br />d-00 <br />17 <br />Conduit, PVC, Schedule 80, 2 IN <br />108 <br />LFT <br />18 <br />Conduit, PVC, Schedule 80, 3 IN <br />26 <br />LFT <br />19 <br />Conduit, PVC, Schedule 80, 4 IN <br />42 <br />LFT <br />/.00 <br />20 <br />Line, Thermoplastic, Crosswalk, <br />102 <br />LFT <br />�._. ___....._ .... <br />It <br />Solid White 6 IN <br />21 <br />Line, Thermoplastic, Solid, White, <br />46 <br />LFT <br />........ <br />co <br />6 IN <br />° <br />22 <br />Line, Epoxy, Solid, White, 6 IN <br />96 <br />LFT <br />r , <br />23 <br />Parking Lot attendant Booth <br />1 <br />EA <br />. ........ -.. ._ <br />1 g, ]g. 61 <br />tg, glq <br />24 <br />Protective Bollards <br />4 <br />EA <br />21,7a3 <br />25 <br />Hardwood Mulch, 3 IN Depth <br />14 <br />CYS <br />.00 <br />26 <br />Irrigation Allowance <br />1 <br />ALLOW <br />$400 <br />27 <br />Irrigation Sleeve, PVC, 4 IN <br />45 <br />LFT <br />r <br />BASE QUOTE TOTAL $ 179, <br />Version 4/2/2019 Page - 28 Public Works Quote <br />