My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Olive Water Treatment Plant Improvements Project No 118-024 - Bowen Engineering Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Olive Water Treatment Plant Improvements Project No 118-024 - Bowen Engineering Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:17:25 AM
Creation date
8/15/2019 9:07:37 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INAVV Wildcat Cree1<VV'TP PROJECT SCOPE <br />WTP Backviash Handling Facility / Kokomo, IN <br />Project Size: $6,000,000 / July 2018 - April 2019 <br />Bowen, teamed with Arcadis to provide new UV disinfection and a Sodium <br />Hypochlorite conversion at Indiana American Water's Wildcat Creek WTP. This <br />project supports safer operations and enhanced treatment of constituents in the <br />water. <br />Project Challenges: <br />This plant is the single source of water to the city of Muncie. The Bowen <br />project team worked with Plant Operations to ensure continous operations of <br />the plant during construction. <br />The site included many unmarked utilities. <br />Bowen Resouurcefuh <br />Bowen carefully supported choosing the correct UV technology to minimize <br />head loss between the filters and chlorine contact tank. <br />Bowen worked with Arcadis in a Design -Build arrangment to optimize <br />constructability of the plant. <br />Bowen IReslf:)ons'hie: <br />d Bowen reconfigured the general arrangement of the plant and project to <br />support an adjusted flow chemical deliveries of trucks to the plant. <br />Bowen Results: <br />Bowen has maintained the agressive schedule <br />Bowen has completed work safely and with zero incidents <br />' Site Work <br />Civil <br />Structural Steel <br />Mechanical <br />0 Structural Steel <br />Mechanical Piping <br />Equipment Setting <br />UV Disinfection <br />Sodium Hypochlorite Conversion <br />Design -Build <br />PROJECT TEAM <br />Bowen Contact: <br />0 Owner Contact: <br />Mark Cvetkovich <br />317 690.9208 <br />Josh Davis <br />317.671.1423 <br />Engineering Partner: Arcadis <br />RESOURCEFUL- PE IPOINSUE. Iwo:::. tU1 rs,, <br />Rev. 10/11 /2018 <br />wwwa Il)oweneu'igli neeirli ng,cou'uru <br />
The URL can be used to link to this page
Your browser does not support the video tag.