Laserfiche WebLink
E. Contractor shall not utilize any roof areas of the Project for staging, stockpiling or <br />hoisting of materials. <br />F. Contractor shall protect, repair and clean architectural precast panels in <br />accordance with the Architectural Precast Design and Performance Criteria. <br />G. Per the schedule provided, all costs for hot/cold weather work have been <br />accounted for and are included. No additional funds will be provided if this <br />Contractor incurs costs for weather conditions that should have been anticipated <br />at bid time. <br />ALTERNATE 06 — Joint Sealants <br />ADD EDUCT 235,300 <br />Base Bid: Panel -to -panel joint sealants not included. <br />Alternate 06: Furnish and install all panel -to -panel joint sealants. <br />A. Per the schedule provided, all costs for hot/cold weather work have been <br />accounted for and are included. No additional funds will be provided if this <br />Contractor incurs costs for weather conditions that should have been anticipated <br />at bid time. <br />RECEIPT OF ADDENDA <br />Addenda Nov " <br />Addenda No. <br />Addenda No. <br />Addenda No. <br />lated <br />Dated <br />ate <br />The undersigned, does hereby declare that We have carefully examined the site of the proposed work, <br />also, the bid documents, and does hereby agree to design, furnish and/or install, as specified in the bid <br />package, all materials, transportation, equipment, labor, supervision, tools, and all other items necessary <br />to do all work in accordance with the bid documents. <br />Signature: <br />Title: Midwest Sales Manager <br />Date: August 12, 2019 <br />Commerce Center Architectural Precast Concrete Panels <br />Appendix A - 5 <br />