My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MOU for Reimbursement - American Electric Power - Reimbursement to City for Michigan St Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
MOU for Reimbursement - American Electric Power - Reimbursement to City for Michigan St Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:54:59 PM
Creation date
8/15/2019 8:39:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEMORANDUM OF UNDERSTANDING <br />FOR REIMBURSEMENT <br />This Memorandum of Understanding for Reimbursement (the "Agreement") is made and <br />effective on Lmr S 7` 2019, by and between the City of South Bend, Indiana (the "City"), <br />and American Electric Power Company, Inc., (hereinafter, "AEP"). <br />WHEREAS, on or about 2016, AEP undertook a major upgrade to its underground <br />electrical infrastructure located in downtown South Bend, Indiana (the "Project"); and <br />WHEREAS, a portion of AEP's Project included installation of an electrical duct bank <br />under the northbound lane of Michigan Street between Western Avenue and Colfax Street, for <br />which AEP engaged the services of an underground utilities installation contractor; and <br />WHEREAS, to install the electrical duct bank, AEP's contractor made an approximately <br />three (" Y) feet long excavation in the northbound lane of Michigan Street; and <br />WHEREAS, the City had plans to replace sections of the concrete pavement along <br />Michigan Street as part of a City project; and <br />WHEREAS, AEP had knowledge of the City's plans and proposed that the City perform <br />the pavement replacement as part of the City's project, instead of AEP's contractor, with AEP <br />reimbursing the City for the costs incurred by the City for the pavement replacement. <br />NOW THEREFORE, in consideration of the mutual promises, covenants and <br />agreements contained herein and other good and valuable consideration, the receipt and <br />sufficiency of which is hereby acknowledged, the parties hereto intending to be legally bound <br />hereby covenant and agree as follows: <br />1. AEP agrees to reimburse the City for the costs incurred by the City for the <br />pavement replacement on Michigan Street in the location depicted in Exhibit A, incorporated <br />herein by reference and attachment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.