Laserfiche WebLink
4 <br />. DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 117-127R Project Name: sBFD Training Center classroom Building Change Order #: 2 <br />DATE INITIATED:7-30-19 BPW DATE: 8-13-19 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Various items were requested to be changed by end user. Some items were deleted to help <br />reduce costs. <br />Attachments: (List documents support change — required) <br />Items include adding and exit door (+$6,779.00), deleting drywall finish on CMU (-$2,554.00), <br />deleting gable louvers (-$303.00), and adding a concrete stoop and walkway (+$2,218.00). <br />Amount of Blncrease / El Decrease: $ 6,140.00 <br />...... Categories (Pick One): <br />Previously approved Change Order(s): It 0'00 _ A Scope of Work <br />............... El Differing Site Conditions, Changed Conditions <br />Current Percent of Change: 0'94%❑ Conflicted Specifications and Drawings <br />El Failed Materials <br />658,228.00 <br />New Total Amount: $m_ ❑ Error <br />mmmm—...._.._.._. ❑Omission <br />Total Percent of Change. 1.28 % <br />El Final Quantity Adjustment <br />�° ❑ <br />Funding Secured From: <br />(filled out by PM) <br />RECOMMENDED BY: <br />Dan Jones L' <br />Project Inspector (Print Name) (Signature) (Date) <br />c <br />REVIEWED BY: <br />Toy Villa �- • �9 <br />— <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Alicia Czarnecki <br />Engineering Project Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Aa <br />Kara Boyles <br />� <br />City Engineer (Print Name) (/ixfu e) (Da e) <br />