My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Unity Gardens Learning Center Site Improvements Project No 117-050R - Ritschard Bros Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Unity Gardens Learning Center Site Improvements Project No 117-050R - Ritschard Bros Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:50:24 PM
Creation date
8/15/2019 8:24:52 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�yM1` Till ° <br />DEPARTMENT OF PUBLIC WORKS <br />�ww,a <br />` DIVISION OF ENGINEERING <br />Project Number: <br />117-050 R Project Name: Urky Gardens Learning Center Site ln,,provern nrs Change Order #: 1 <br />DATE INITIATED: 5-11-19 .. MBPW DATE: 8-13-19 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Increased paving quantity. Design road thickness assumed to be 6.5", but upon excavation it was <br />determined to be 12". Plan sheet shows to at least match existing. <br />Attachments: (List documents support change - required) <br />HMA Surface overrun of 2.67 tons (+$734.25) <br />HMA Base overrun of 16.58 tons (+$3,647.60) <br />Amount of 8 Increase / ❑ Decrease: $ 4, 381.85 <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 0'00 __ ❑ Scope of Work <br />-- ..-• ® Differing Site Conditions, Changed Conditions <br />Current Percent of Change: 6.34 <br />❑ Conflicted Specifications and Drawings <br />73 541.85 El Failed Materials <br />New Total Amount: $ ' <br />El Error <br />El Omission <br />Total Percent of Change: 6.34 <br />❑ Final Quantity Adjustment <br />Funding Secured From: - -- , at <br />(filled out by PM) <br />RECOMMENDED BY: <br />Dan Jones <br />Project Inspector (Print Name) (Signature) (Date) <br />REVIEWED BY: <br />Toy VillaVL <br />E • S , t9 <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Charlotte Brach <br />Engineering Project Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Kara Boyles <br />City Engineer (Print Name) (Signature) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.