Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 118-074A Project Name: Three Twenty at the Cascade � GWzed Assemblies Change Order #: 1 <br />DATE INITIATED: 7-31-19 <br />m <br />BPW DATE: 8-13-19 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Various on -site changes were needed to ensure proper installation in coordination with other <br />trades. <br />Attachments: (List documents support change — required) <br />N/A <br />Amount of @A Increase / ❑ Decrease: $ 24,632 <br />....... <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 0.00 <br />_ 8 Scope of Work <br />.... <br />El Differing Site Conditions, Changed Conditions <br />Current Percent of Change: '70 <br />8 Conflicted Specifications and Drawings <br />New Total Amount: $1,472,632.00 <br />❑ Failed Materials <br />❑ Error <br />....... ......... <br />1.70 <br />El Omission <br />Total Percent of Change: <br />❑ Final Quantity Adjustment <br />Funding Secured From: UL-Wlug p - o-4Z'o�, ❑ <br />out by PM) Qw-,r r _ , DA TIP <br />RECOMMENDED BY: <br />Dan Jones <br />Project Inspector (Print Name) <br />(Signature) (Date) <br />REVIEWED BY: <br />Toy Villa <br />8 •Z -1q <br />Construction Manager (Print Name) <br />(Signature) (Date) <br />APPROVED BY: <br />Zach Hurst <br />Engineering Project Manager (Print Name) <br />(Signature) (Date) <br />APPROVED BY: <br />Kara Boyles <br />City Engineer (Print Name) <br />(Signature) (Date) <br />