My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement - Network Solutions Inc - Cidsco Network Equipment
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Agreement - Network Solutions Inc - Cidsco Network Equipment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:09:39 PM
Creation date
8/15/2019 8:16:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• City of South Bend will provide floorplans of each building where wireless equipment is being installed into (electronic <br />preferred). <br />• City of South Bend will provide a list of SSIDs that should be available to users. <br />• City of South Bend will provide an expected window of time that changes can be made to the network including those <br />identified as disruptive. <br />• City of South Bend will provide a list of critical services that must be functional in order for testing to be considered <br />successful. <br />• NSI will apply labeling to equipment for easy identification as requested. <br />Hardware Installation <br />• City of South Bend will ensure timely access to the equipment installation area. Installation delays caused by access <br />restrictions may be billable on a per occasion instance. <br />• City of South Bend will provide lift access if required for high AP cabling or installation (if applicable). <br />• City of South Bend will provide DHCP services for any new networks that are created. <br />• City of South Bend will install and document the location of each access point by room number, name, and AP MAC <br />address. <br />• NSI will reconfigure the switching infrastructure with new VLANs for new wireless SSIDs (up to 4) on the switching <br />infrastructure. Further configuration of switches is outside the scope of this project unless otherwise specified. <br />Testin <br />City of South Bend will test access to their critical services identified in the testing plan. <br />• NSI will verify proper operation of the installed equipment as identified in the testing plan„ <br />Division of Labor— UPS <br />Equipment Deliver <br />• City of South Bend will designate a location for all ordered equipment to be delivered to. This location should provide <br />a secure temperate area for storage and staging of equipment. <br />• City of South Bend will transport equipment to each respective installation location, if the install location is at a <br />different address from the shipping location. <br />Project Preparation <br />• City of South Bend will verify any other equipment (servers, web filters, etc) that will be powered off for UPS <br />installation are adequately backed up and prepared to be shutdown. <br />• City of South Bend provide an expected window of time that UPS units can be installed. Network services will be <br />disrupted during this time. <br />• NSI will verify all devices that will be powered off for UPS installation have their current configuration saved as the <br />startup configuration. <br />Hardware Installation <br />• City of South Bend will shut down any other equipment (servers, web filters, etc) that will be powered off for UPS <br />installation. <br />• NSI will assemble the UPS units including installation of any rackmount hardware, batteries, and network <br />management cards included in the order. <br />• NSI will install new UPS units in the rack or on the floor as space is available. <br />www.nsil.com WHY we do is as important as WHAT we do (574) 271-0900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.