Laserfiche WebLink
REGULAR MEETING <br />JULY 23.2019 205 <br />R&R EXCAVATING, INC <br />2010 Went Avenue <br />Mishawaka, IN 46545 <br />Bid was signed by: William Loudin <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />Base Bid Total $2,400,000.00 <br />Unit Pricing <br />Item <br />Description <br />Unit <br />Unit Price <br />No. <br />1 <br />Disposal of Contaminated Soils <br />TON <br />$250.00 <br />2 <br />Disposal of Asbestos Containing <br />TON <br />$250.00 <br />Material <br />3 <br />Disposal of Lead Containing Material <br />FT6N 1 <br />$250.00 <br />GREEN DEMOLITION CONTRACTORS <br />523 Northbrook Drive <br />Michigan City, IN 46360 <br />Bid was signed by: Michael Brough <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />Base Bid Total $1,298,000.00 <br />Unit Pricing <br />Item <br />No. <br />Description <br />Unit <br />Unit Price <br />1 <br />Disposal of Contaminated Soils <br />TON <br />$190.00 <br />2 <br />Disposal of Asbestos Containing <br />Material <br />TON <br />$220.00 <br />3 <br />Disposal of Lead Containing Material <br />TON 1 <br />$198.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were <br />referred to Code Enforcement and Engineering for review and recommendation. <br />OPENING OF BIDS — WAYNE STREET AND LEIGHTON PLAZA PARKING <br />STRUCTURE REPAIRS 2019 — PROJECT NO. 119-048 PARKING GARAGE FUND <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />BERGLUND CONSTRUCTION COMPANY <br />8410 S. South Chicago Ave. <br />Chicago, IL 60617 <br />Bid was signed by: Jack Tribbia <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />P <br />Base Bid Part #1— Wayne St. PS Total $447,465 <br />Base Bid Part #2 — Leighton Plaza PS $379,540 <br />Total <br />Alternates Total <br />1 <br />1 <br />1 <br />