Laserfiche WebLink
q:: ii111ed 1n If: y W A Jeu°ues <br />SPECIFICATIONS <br />CITY OF SOUTH BEND <br />BID NAME Spec R - Twenty -Nine (29) Brand New Leaf Boxes <br />�._................_..._ W......_....................................................... ..... <br />FOR BIDS DUE July 23, 2019; 9:30 a.m. <br />Pursuant to notices given, the undersigned offers bid(s) to the City of South Bend in accordance with the <br />following attachment(s) which specify the class or item number or description, quantity, unit, unit price. <br />wmeprill 1! 10.. <br />It is the intent of these specifications to describe brand new leaf boxes for the city of South Bend. <br />All units bid must have been manufactured in the U.S.A. <br />The City of South Bend reserves the right to reject any and all bids or to accept a full or partial <br />award for the bid or bids which, in its judgment, will be in the best interest of the City of South <br />Bend. <br />Any exceptions to the following specifications must be noted by the dealer at the tie of bidding <br />in order for the bid to be valid. The following specifications are for the city of South Bend's <br />Municipal Fleet. Vendor to complete bid proposal, alternates, and nondiscrimination <br />commitment contained in this bid specifications and attach to submitted bid. <br />Minimyin S eeif , tions: <br />3/16" x l %z" x 1 1/z" angle iron frame. '�"e <br />12-gauge steel panels. <br />Top hinged door with 4 vertical and 4 horizontal braces with 12-gauge steel panels. The door <br />shall be hinged from the top and have a hose support and flexible rubber gasket with a 16" <br />diameter hole to accommodate the exhaust hose. Hinges shall be 3/8" thick with 3/8" pins. Latch <br />handle shall be easy to access and easy to use. The exact placement of the 16" rubber hole will <br />be verified with the Director of Equipment Services Prior to boxes being built. <br />Interior walls will be smooth )"e,: <br />Roof shall have at least two thirds vented by means of/2" expanded metal and shall be supported <br />by 3/16" x 1 1/2" angle iron. "^,fie„;, <br />Floor Shall be constructed in a manner that will allow the unit to be installed and removed with a <br />forklift. The floor shall be covered with a minimum of 12 gauge steel panels. yes °1 y �,] aii.ua e 51 14� <br />Boxes will be prepped according to paint manufacturers standards and have a rust inhibitor <br />primer applied along with at least two coats of Omaha Orange polyurethane paint. ^� es <br />Quantity: Twenty-nine (29) more or less <br />